Tender Details
Particulars | Details |
---|---|
Title |
General Kp Mitagation Of Flood In Padasekharam Of Kuttanad Taluk Mitagation Of Flood In Karee Padasekharam In Nedumudy Panchayat General Civil Work
|
Description |
General Kp Mitagation Of Flood In Padasekharam Of Kuttanad Taluk Mitagation Of Flood In Karee Padasekharam In Nedumudy Panchayat General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_754475_1 |
Reference Number |
IRR/KP/TR/652/2025_5_1_1/1 |
Tender Fee | 6508 |
EMD | 50000 |
Tender Value | |
Place | Nedumudy Alappuzha |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1225002 |
Start Date | March 24, 2025 23:30 |
End Date |
01/04/2025 ( Expired 52 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreProviding cement concrete road at south car street, thanumalyannager, chidhamparapuram road, sahayapuram, karayankuzhi road, anjeneyar nager road in suchindrum town panchayat
Special fund work- providing cement concrete road at south car street, thanumalyannager, chidhamparapuram road, sahayapuram, karayankuzhi road, anjeneyar nager road in suchindrum town panchayat
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreTalab development work in ward no.12-mangal pandey nagar, nagar panchayat kaptanganj.
Talab development work in ward no.12-mangal pandey nagar, nagar panchayat kaptanganj.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreWall painting, artistic, 3d graphity, traditional and writing work in different locations of municipal corporation katni area
Wall painting, artistic, 3d graphity, traditional and writing work in different locations of municipal corporation katni area
Read moreof your Industry type