Tender Details
Particulars | Details |
---|---|
Title |
Sealdah Development Of Coaching Maintenance Infrastructure At Sealdah Electrical Works For Construction Of 03 Nos. Washing Apron At Nss Yard/Sdah.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78594770 |
Reference Number |
ELEG-GSU-OT-14-2024-25 |
Tender Fee | 0 |
EMD | 2.88 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78594770/viewNitPdf_4781517.pdf |
Start Date | November 22, 2024 19:20 |
End Date |
13/12/2024 ( Expired 151 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreEmpanelment of contractors for civil and electrical works at iit dharwad
Empanelment of contractors for civil and electrical works at iit dharwad
Read moreRepair maintenance of 33 kv mrs yard and other allied works at dolphin hill, ins eksila, nad and dega area under age em ii of ge u i visakhapatnam
Repair maintenance of 33 kv mrs yard and other allied works at dolphin hill, ins eksila, nad and dega area under age em ii of ge u i visakhapatnam
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreManufacture and supply of 24000 nos of 9 m 300kg wl psc poles as per rec design cast in twin mould form boxes at poothamedu psc yard for a period of two years
Manufacture and supply of 24000 nos of 9 m 300kg wl psc poles as per rec design cast in twin mould form boxes at poothamedu psc yard for a period of two years
Read moreRemoval and development of the old existing borewell and replacement of all connected items for the water supply at mtrdc residential area and provision of new borewell for the maintenance of existing arboricuture and lanscaping works at phase i
Removal and development of the old existing borewell and replacement of all connected items for the water supply at mtrdc residential area and provision of new borewell for the maintenance of existing arboricuture and lanscaping works at phase i
Read moreConstruction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl
Construction of stack yard for storing of tower materials with concrete approach pathway and open stackyard at bankura 132/33 kv sub station under bankura area office wbsetcl
Read moreof your Industry type