Tender Details
Particulars | Details |
---|---|
Title |
Shifting ( Dismantling The Existing Mast And Erection Of The Same Mast ) Of 30m Guy Wire Mast From Bhuj To Dwarka (Gujarat) (As Per Specification / Drawing )
|
Description |
Shifting ( Dismantling The Existing Mast And Erection Of The Same Mast ) Of 30m Guy Wire Mast From Bhuj To Dwarka (Gujarat) (As Per Specification / Drawing )
|
Organisation | Prasar Bharati, Broadcasting Corporation of India | Autonomous Bos |
Tender Id | 2025_PrasarBharati_25899 |
Reference Number |
DG (E)(WZ)/AIR-P/Shifting of 30m Guy wire Mast from Bhuj to Dwarka/ 2024-25/NIT-2/2024-25 |
Tender Fee | 0 |
EMD | 16086 |
Tender Value | |
Place | Delhi |
Link | https://prasarbharati.eproc.in |
Start Date | February 03, 2025 23:30 |
End Date |
18/02/2025 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreSupply, installation, testing and commissioning (sitc) of new split air conditioners against the buyback of old acs with miscellaneous work of hvac and upkeep of existing air conditioners and refrigeration units as per technical specification.
Supply, installation, testing and commissioning (sitc) of new split air conditioners against the buyback of old acs with miscellaneous work of hvac and upkeep of existing air conditioners and refrigeration units as per technical specification.
Read moreA.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.
A.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Surfacing works of gsb 15 cm thick wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on elmagunda-duler-metagudem road between km 0.000 to km 18.963 to nhsl specification
Read moreSupply of 16 mtrs high mast poles for the work of transportation and erection of high mast poles from vishnu nivasam rest house,tirupati to car parking area nearby additional pac,sevasadan-1 and 2 at tirumala(part-b)
Supply of 16 mtrs high mast poles for the work of transportation and erection of high mast poles from vishnu nivasam rest house,tirupati to car parking area nearby additional pac,sevasadan-1 and 2 at tirumala(part-b)
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreDismantling, shifting and installing existing dg sets of capacity 250 kva to the scholars hostel, feeder pillar to the dispensary road in cecri, karaikudi campus and 30 kva dg to the mandapam unit from cecri karaikudi campus
Dismantling, shifting and installing existing dg sets of capacity 250 kva to the scholars hostel, feeder pillar to the dispensary road in cecri, karaikudi campus and 30 kva dg to the mandapam unit from cecri karaikudi campus
Read moreR and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 93.000 to km. 136.000 in up and hr at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca
R and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 93.000 to km. 136.000 in up and hr at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca
Read moreR and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 46.500 to km. 93.000 in up at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca.
R and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 46.500 to km. 93.000 in up at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca.
Read moreof your Industry type