Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Eor To Pandit Madan Mohan Malviya Hospital, Malviya Nagar, New Delhi. Sh Construction Of Room For Jan Aushadhi Kendra.
|
Description |
Eor To Pandit Madan Mohan Malviya Hospital, Malviya Nagar, New Delhi. Sh Construction Of Room For Jan Aushadhi Kendra.
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWD_273601_1 |
Reference Number |
18/EE/HMD(SW)/PWD/2025-26 |
Tender Fee | 0 |
EMD | 10673 |
Tender Value | |
Place | MALVIYA NAGAR |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=359674 |
Start Date | June 09, 2025 23:15 |
End Date |
16/06/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreConstruction of medical college at atal bihari vajpayee institute of medical sciences and dr. ram manohar lohia hospital, delhi
Construction of medical college at atal bihari vajpayee institute of medical sciences and dr. ram manohar lohia hospital, new delhi
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreConstruction of two tube well boring, pumping plant, tube well room and electrification work for power in pocket-a of transport nagar scheme.
Construction of two tube well boring, pumping plant, tube well room and electrification work for power in pocket-a of transport nagar scheme.
Read moreEngineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Read more06/se/c-ii/r b/kmda/ w-28 (part-viii) of 2025-2026 date- 25/06/2025
Construction of a new bailey bridge both ways (to and fro journey) at lake town, vip road and salt lake connector near dakshindari. (first call).&#x0d sh -for foundation and sub-structure work.&#x0d
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreConstruction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur-- sitc of dg set
Construction for infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds (residential part, non residential part, elect part, and it infrastructure work), utttar dinajpur. --sitc of dg set
Read moreDnit for modernization of various rural link roads falling in mc lalru and banur (earth work including construction of culverts drain etc) district sas nagar (special assistance to states for capital investment 2025-26 scheme) with 5 years maintena
Dnit for modernization of various rural link roads falling in mc lalru and banur (earth work including construction of culverts drain etc) district sas nagar (special assistance to states for capital investment 2025-26 scheme) with 5 years maintena
Read moreof your Industry type