Tender Details
Particulars | Details |
---|---|
Title |
Rehabilitation And Up Gradation Of Wardha (Salod Hirapur) Pulgaon Section Of Nh 347 A From Km 0/000 To Km 24/887(design Chainage Km 0/000 To Km 24/792) To Two Lane With Paved Shoulder In The State Of Maharashtra On Epc Mode
|
Description |
Rehabilitation And Up Gradation Of Wardha (Salod Hirapur) Pulgaon Section Of Nh 347 A From Km 0/000 To Km 24/887(design Chainage Km 0/000 To Km 24/792) To Two Lane With Paved Shoulder In The State Of Maharashtra On Epc Mode
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 30000 |
EMD | 2.81 Crore |
Tender Value | |
Place | wardha pulgaon |
Link |
AAAAAAAAAA Login to view |
Start Date | November 08, 2024 16:30 |
End Date |
21/04/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation of wardha (salod hirapur) pulgaon section to 2ps in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation of wardha (salod hirapur) pulgaon section to 2ps in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreConstruction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Read moreof your Industry type