Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation And Installation Of 01 No. 1000 Gpm Ht Pump And 01 No. 500 Gpm Lt Pump, With All Accessory (Motor, Er, Power Cable And Laying 6 Inch Dia. Pipe Line) In Iv B Seam At Piparia Colliery (Ug Mine), Umaria Sub Area, Johilla Area
|
| Description |
Transportation And Installation Of 01 No. 1000 Gpm Ht Pump And 01 No. 500 Gpm Lt Pump, With All Accessory (Motor, Er, Power Cable And Laying 6 Inch Dia. Pipe Line) In Iv B Seam At Piparia Colliery (Ug Mine), Umaria Sub Area, Johilla Area
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_327967_1 |
|
Reference Number |
SECL/GM/JOH/Survey/ eTender/24-25/ 31 dt-05/02/2025 |
| Tender Fee | 0 |
| EMD | 14300 |
| Tender Value | - |
| Place | Piparia Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339951 |
| Start Date | February 06, 2025 15:30 |
| End Date |
Expired
20/02/2025
Expired 601 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read moreConstruction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Read moreConstruction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Construction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Read moreCleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Cleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Read moreCarriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Carriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Read moreConstruction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Construction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Read moreDrivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Drivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Read moreLine packing including packing with materials for cm panel no. 40r, 34r and 34la dev. distt. of 10b seam at haldibari ug mine.
Line packing including packing with materials for cm panel no. 40r, 34r and 34la dev. distt. of 10b seam at haldibari ug mine.
Read morePreparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreTransportation and installation of 1000mm belt conveyor in proposed 70lw lhd dev. district in v-top seam at baherabandh ug mine of hasdeo area.
Transportation and installation of 1000mm belt conveyor in proposed 70lw lhd dev. district in v-top seam at baherabandh ug mine of hasdeo area.
Read moreof your Industry type