Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Solar 1 / 3 / 5 Hp Submersible Pump With Solar Panel. (Iso Certified) Bore Well
|
| Description |
Providing Solar 1 / 3 / 5 Hp Submersible Pump With Solar Panel. (Iso Certified) Bore Well
|
| Organisation | Head Of Forest Force Nagpur Maharashtra State | State Govt. and UT |
| Tender Id | 2024_HFFN_1057605_1 |
|
Reference Number |
2024-25/MTR/Notice_3 |
| Tender Fee | 1180 |
| EMD | 0 |
| Tender Value | - |
| Place | Chikhaldara Range |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1848159 |
| Start Date | July 25, 2024 17:30 |
| End Date |
Expired
31/07/2024
Expired 803 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supplying installation & commissioning of 25 hp submersible pump set with indoor type lt industrial panel electric service cable power wiring light wiring etc. for hanuman tempel sangatper ward no 04 under nagar parishad phulwari sharif
Supplying installation & commissioning of 25 hp submersible pump set with indoor type lt industrial panel electric service cable power wiring light wiring etc. for hanuman tempel sangatper ward no 04 under nagar parishad phulwari sharif
Read moreDrilling of bore well at bhagath singmarg graveyard under rodamestri nagar ward-279 at chintal circle-54,qpz,cmc. (item no.4) (completion period 1 month)
Drilling of bore well at bhagath singmarg graveyard under rodamestri nagar ward-279 at chintal circle-54,qpz,cmc. (item no.4) (completion period 1 month)
Read moreDrilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Drilling of bore well at lenin nagar muslim graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.6) (completion period 1 month)
Read moreDrilling of bore well installation of pumpset and laying of pipeline with 02 syntax water tanks at ward no 06 in bichkunda municipality under 15th finance commission funds.
Drilling of bore well installation of pumpset and laying of pipeline with 02 syntax water tanks at ward no 06 in bichkunda municipality under 15th finance commission funds.
Read moreDrilling of bore well at lenin nagar hindu graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.5) (completion period 1 month) (reserved for st)
Drilling of bore well at lenin nagar hindu graveyard under rodamestrinagar ward-279 at chintal circle-54,qpz,cmc (item no.5) (completion period 1 month) (reserved for st)
Read moreDrilling of bore well installation of pumpset and laying of pipeline with syntax water tanks at beside parameshwari theatre at ward no.6 in bichkunda municipality under 15th finance commission funds.
Drilling of bore well installation of pumpset and laying of pipeline with syntax water tanks at beside parameshwari theatre at ward no.6 in bichkunda municipality under 15th finance commission funds.
Read moreDrilling of bore well installation of pumpset at boyiwada near old hanuman mandir in ward no.3 and flushing of bores at various locations of bichkunda municipality under 15th finance commission funds.
Drilling of bore well installation of pumpset at boyiwada near old hanuman mandir in ward no.3 and flushing of bores at various locations of bichkunda municipality under 15th finance commission funds.
Read moreLabour charges for the extension of the chatlapur bore well water supply pipe line from kk-3 f/bed to kk-5 f/bed by laying hdpe line along the road at mm township, mandamarri area
Labour charges for the extension of the chatlapur bore well water supply pipe line from kk-3 f/bed to kk-5 f/bed by laying hdpe line along the road at mm township, mandamarri area
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreI) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
I) painting to the external walls, repairs to the doors windows of control room building and other miscellaneous works at 220kv ss huzurabad in omc circle, karimnagar. ii) drilling of new bore well at 132kv ss suglampally in omc circle, karimnagar.
Read moreof your Industry type