Title |
The Protection Work Upstream Of Power Station On Left Bank Of
|
Description |
The Protection Work Upstream Of Power Station On Left Bank Of &Amp#X0d
Soan River At Soanprayag Block Ukhimath. Distt Rudraprayag (Reach 0.00 Mtr To 70.00mtr)&Amp#X0d
|
Organisation | IRD - Chief Engineer | State Govt. and UT |
Tender Id | 2025_IRDCE_80634_1 |
Reference Number |
02/seiwcrpg/202425 |
Tender Fee | 5900 |
EMD | 4.79 Lakh |
Tender Value | |
Place | SONPRAYAG RUDRAPRAYAG |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=96174 |
Start Date | February 24, 2025 14:30 |
End Date |
10/03/2025 ( Expired 103 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreModification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreProcurement of 07 number 500mva power transformers on turnkey basis.
Design supply erection testing commissioning of 07 no of 400 220 33kv 500 mva power transformer at 400 kv sub stations of dtl on turnkey basis
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreEngineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.