Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing Retaining Protection Wall On The South Side Of Cooling Water Open Channel For Unit 1, 2 And 3 Chainage From Ch 850 To Ch 900 M From Outside Of Peripheral Compound Wall At Ttps.
|
Description |
Providing Retaining Protection Wall On The&Amp#X0d
South Side Of Cooling Water Open Channel For Unit 1, 2 And 3 Chainage From Ch 850 To Ch 900 M From Outside Of Peripheral Compound Wall At Ttps.
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_413598_1 |
Reference Number |
CE SE Civil TTPS Spec.No.284 23 24 |
Tender Fee | 0 |
EMD | 18800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=492105 |
Start Date | January 26, 2024 23:30 |
End Date |
02/02/2024 ( Expired 514 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Arresting leakage to the damaged roof in south side in pch 2 building at 20m height and providing protection wall along conveyor 48 a and b in echs area at ttps
Arresting&#x0d leakage to the damaged roof in south side in pch 2 building&#x0d at 20m height and providing protection wall along conveyor 48 a and b in echs area at ttps
Read moreRectification works to the damaged south side inner walls ch 0m to 300m towards east in open channel of cooling water channel 2
Rectification works to the damaged south side inner walls ch&#x0d 0m to 300m towards east in open channel of cooling water&#x0d channel 2
Read moreProviding chain link fencing from cprc compound to lsfm c yard east side gate and removing the existing damaged barbed wire fencing and solid block work over the existing compound wall at eastern side of br no.2 (phase ii) at tnpl unit i
Providing chain link fencing from cprc compound to lsfm c yard east side gate and removing the existing damaged barbed wire fencing and solid block work over the existing compound wall at eastern side of br no.2 (phase ii) at tnpl unit i
Read moreRectification works to the damaged south side inner walls ch 300m to 600m towards east in open channel of cooling water channel 2
Rectification works to the damaged south side inner walls ch 300m to 600m towards east in open channel of cooling water&#x0d channel 2
Read moreRectification works to the damaged north side inner walls ch 0m to 300m towards east in open channel of cooling water channel 2
Rectification works to the damaged north side inner walls ch&#x0d 0m to 300m towards east in open channel of cooling water&#x0d channel 2
Read more1) colouring to zp school building at harsoda,2) repairs to grampanchayat building 3) providing and fixing concrete paver for samajmandir at harsoda, 4)construction of urinal unit at harsoda,5) construction of compound wall at harsoda, gp harsoda
1) colouring to zp school building at harsoda,2) repairs to grampanchayat building 3) providing and fixing concrete paver for samajmandir at harsoda, 4)construction of urinal unit at harsoda,5) construction of compound wall at harsoda, gp harsoda
Read moreConstruction of rcc retaining wall along 45 m periphery road to protect the road from river water during rainy season near y junction of sec- 2 and 3, pkuc construction of 5ft ht rcc retaining wall all other works contingent thereto complete in all
Construction of rcc retaining wall along 45 m periphery road to protect the road from river water during rainy season near y junction of sec- 2 and 3, pkuc construction of 5ft ht rcc retaining wall all other works contingent thereto complete in all
Read moreConstruction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii
Construction of 65 m mtr. wharf from chainage 244 m to 309m on the lee side of break water at androth for coast guard vessels- providing external service power/ water supply and firefighting equipment- phase-ii
Read moreConstruction of storm water drains from km 1/1 to 2/6, 3/6-4/6 on right side of bye pass road to nizamabad in nizamabad district
Construction of storm water drains from km 1/1 to 2/6, 3/6-4/6 on right side of bye pass road to nizamabad in nizamabad district
Read moreSweeping and cleaning of all road floor areas on the south side of power house of unit 1, 2, and 3 within a zone area for the period from 01.04.2025 to 31.03.2026
Sweeping&#x0d and cleaning of all road floor areas on the south side of power&#x0d house of unit 1, 2, and 3 within a zone area for the period&#x0d from 01.04.2025 to 31.03.2026
Read moreof your Industry type