Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mom For Arresting Heavy Leakages With Requisite Material And Appurtances At Different Locations On 900,1500mm Dia Transmission Lines Of Phase I From Patancheru To Lingampally, Phase Ii From Patancheru To Hydernagar Under Pipeline Section, Sd Iii, O And M Division Viii, Patancheru For The Period Of One Year
|
| Description |
Manning And Operation And Maintenance For Arresting Heavy Leakages With Requisite Material And Appurtances At Different Locations On 900, 1500mm Dia Transmission Lines Of Phase I From Patancheru To Lingampally, Phase Ii From Patancheru To Hydernagar Under Pipeline Section, Sd Iii, Om Division No.Viii, Patancheru For A Period Of One Year
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 545802 |
|
Reference Number |
EP No.44/CGM(E)/TC/T1/OMDiv-VIII/2024-25, dated: 21-09-2024 |
| Tender Fee | 4509 |
| EMD | 1.27 Lakh |
| Tender Value | |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | September 23, 2024 06:00 |
| End Date |
Expired
26/09/2024
Expired 654 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Arresting leakage on 3000mm dia ms ring main at km 16.50 on service road of orr under pipeline section of sd-iii, patancheru, transmission division ii, patancheru
Arresting leakage on 3000mm dia ms ring main at km 16.50 on service road of orr under pipeline section of sd-iii patancheru, transmission division ii, patancheru
Read moreArresting heavy leakage on 3000mm dia ms ring main at ch.16.14km on service road/cycle track of orr at vattinagulapally (v) under singur section, sd-iii, transmission div.ii, patancheru
Arresting heavy leakage on 3000mm dia ms ring main at ch.16.14km on service road/cycle track of orr at vattinagulpally (v) under singapur section, sd-iii, transmission div.ii,patancheru.
Read moreReplacement of 1200mm dia old psc pipes with new 1200mm dia ms inine and outcoating pipes in between at velimela village on ph-iv and iii 1200mm dia transmission gravity main from singapur to lingampally under singapur section, sd-iii, td-ii, patancheru
Replacement of 1200mm dia old psc pipes with new 1200mm dia ms inline and out coating pipes in between ch.no.309.00 to 310 at velimala village on phase iv 1200mm dia transmission gravity main from singapur to lingampally under singapur section sd iii, transmission division no.ii patancheru. replacement of 1200mm dia old psc pipes with new 1200mm dia ms inline and out coating pipes in between ch.no.311.00 to 313 at velimala village on phase iii 1200mm dia transmission gravity main from singapur to lingampally under singapur section sd-iii transmission division no.ii, patancheru 2 slices
Read moreManning, operation and maintenance of phase-iii 150 mls wtp at peddapur for the period of one year under peddapur section, sd-ii, peddapur, o and m division viii, patancheru.
Manning, operation and maintenance of phase-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii,peddapur, om division no. viii, patancheru
Read moreMaintenance (arresting of leakages / bursts) of pumping mains, gravity mains and distribution pipe lines in ae-28 section for the period of one year
Maintenance (arresting of leakages / bursts) of pumping mains, gravity mains and distribution pipe lines in ae-28 section for the period of one year
Read moreShifting of existing 600mm dia scour valve on 1200mm dia psc gravity pipeline from prashasan to lingampally at besides cr foundation, kondapur main road, under lingampally section, sd-ii, td-iv, control room.
Shifting of existing 600mm dia scour valve on 1200mm dia psc gravity pipeline from prashasan nagar to lingampally at besides cr foundation, kondapur main road, kondapur under lingampally section, sd-ii, transmission division - iv, control room, secunderabad
Read moreManning, operation and maintenance of phase iv 150 mld water treatment plant and jackwells for the period of (1) one year under singoor section, sd-ii, peddapur, o and m division viii, patancheru
Manning, operation and maintenance of phase iv 150 mld water treatment plant and jack wells for the period of (1) one year under singoor section, sd-ii, peddapur o and m division no. viii, patancheru
Read moreStrengthening of 1200mm dia psc pipe lines of phase-iii at different locations from water works kajauli to water works sector 39 chandigarh
Strengthening of 1200mm dia psc pipe lines of phase-iii at different locations from water works kajauli to water works sector 39 chandigarh
Read moreMaintenance to arresting of leakages / bursts of 700 mm dia 300 mm dia pumping mains pipe lines from gosthani head water works to yendada balancing reservoir for the period of 12 months.
Maintenance to arresting of leakages / bursts of 700 mm dia 300 mm dia pumping mains pipe lines from gosthani head water works to yendada balancing reservoir for the period of 12 months.
Read moreAttending heavy/minor leakages on 1200/900/800/700mm dia psc/ms gravity mains from hydernagar also for chokages/repairs/overhauling of valves and jungle cutting etc., under annual maintenance contract for the period of two years under hydernagar section, sd.no.iii of td-iv, control room
Attending heavy/minor leakages on 1200/900/800/700mm dia psc/ms gravity mains from hydernagar also for chokages/repairs/overhauling of valves and jungle cutting etc., under annual maintenance contract for the period of two years under hydernagar section, sub division no. iii of transmission div.iv, control room
Read moreof your Industry type