Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Boundary Wall At Hs Andoo (Phase 1st) (Balance Portion)
|
Description |
Construction Of Boundary Wall At Hs Andoo (Phase 1st) (Balance Portion)
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 200 |
EMD | 1120 |
Tender Value | |
Place | vailoo |
Link |
AAAAAAAAAA Login to view |
Start Date | June 23, 2025 21:30 |
End Date |
30/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of medical sub centre at tegazong nhm
Construction of medical sub centre at tegazong nhm
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read moreProvn of md accn (phase-ii of two phases) at missamari under ge missamari
Provn of md accn (phase-ii of two phases) at missamari under ge missamari
Read moreConstruction of fence and road along fence 20.30 km and approach roads 49.00 km along indo myanmar border from bp 159 to bp 162 bp-159 chop bp-160 raho bp 161noglo bp 162 1st noglo bp 162 2nd noglo and bp 162 3rd noglo in longding and tirap district
Construction of fence and road along fence 20.30 km
 and approach roads 49.00 km along indo myanmar
 border
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreof your Industry type