Tender Details

Particulars Details
Title
Fabrication Of A Safety Bucket, 4 Nos 29 Mm Winding Rope Rest Clamp, Shifting Head Gear Pulley And Dismantle Of Pit Top Cover For Lifting Of 02 Nos Stucked Submersible Pump Set In 6 Pit Of Kb 5/6 Pit Colliery.
Description
Fabrication Of A Safety Bucket, 4 Nos 29 Mm Winding Rope Rest Clamp, Shifting Head Gear Pulley And Dismantle Of Pit Top Cover For Lifting Of 02 Nos Stucked Submersible Pump Set In 6 Pit Of Kb 5/6 Pit Colliery.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_328343_1
Reference
Number
BCCL/PBA/AM(EnM)/2024-25/96 dated-08.02.2025
Tender Fee 0
EMD 4500
Tender Value -
Place KB 5/6 PIT COLLIERY
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340387

Start Date February 08, 2025 23:30
End Date
Expired 19/02/2025

Expired 599 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Sealing covering dismantle and pit and and lifting tandan cage and suspension gear and installation of headgear top 1 mtr size headgear pulley 1 pit putkee colliery.

Sealing &#x0d covering &#x0d dismantle &#x0d and pit &#x0d and &#x0d and &#x0d lifting tandan cage &#x0d and suspension gear &#x0d and installation of &#x0d headgear top 1 mtr &#x0d size headgear pulley &#x0d 1 pit putkee colliery.

Read more
Replacement of 6/12 girder 6 no dismantle old and damaged plate of pit top, dismantle cage catcher cage catcher guarder shifting winding engine headgear pulley of 01 pit victory section for the purpose of lowering 1000 gpm 300hp 200 mtr head submer

Replacement of 6/12 girder 6 no dismantle old and damaged plate of pit top, dismantle cage catcher cage catcher guarder shifting winding engine headgear pulley of 01 pit victory section for the purpose of lowering 1000 gpm 300hp 200 mtr head submer

Read more
Fabrication of pit top platformwith installation 2 nos of one mtr pulley, dismantling of existing 3 mtr winding engine headgear pulley and replacement of headgear pulley main girder and ms plate at 2 pit(m) under gopalchak colliery

Fabrication of pit top platformwith installation 2 nos of one mtr pulley, dismantling of existing 3 mtr winding engine headgear pulley and replacement of headgear pulley main girder and ms plate at 2 pit(m) under gopalchak colliery

Read more
Non-destructive testing of winding rope, vital components of steam winder assembly, cage suspension gear and head gear pulley shaft of pit no-04 and pit no- 05 at ningah colliery under satgram-sripur area.

Non-destructive testing of winding rope, vital components of steam winder assembly, cage suspension gear and head gear pulley shaft of pit no-04 and pit no- 05 at ningah colliery under satgram-sripur area.

Read more
Non-destructive testing of winding rope, vital components of steam winder assembly, cage suspension gear and head gear pulley shaft of pit no 4 and pit no 5 at ningah colliery under satgram-sripur area

Non-destructive testing of winding rope, vital components of steam winder assembly, cage suspension gear and head gear pulley shaft of pit no 4 and pit no 5 at ningah colliery under satgram-sripur area

Read more
Fabrication pipe clamp 70 sq mm cable clamp rope clamp 25mm dia pipe and pump rest clamp 1 set and fabrication of submersible pump safety cage 15 feet 6 inch length and 18 inch diameterfor 600 gpm and 180 hp submrsible pump of victory 1 pit

Fabrication pipe clamp 70 sq mm cable clamp rope clamp 25mm dia pipe and pump rest clamp 1 set and fabrication of submersible pump safety cage 15 feet 6 inch length and 18 inch diameterfor 600 gpm and 180 hp submrsible pump of victory 1 pit

Read more
Const of buildings control pmcc bldg store room driver rest fan room toilet block invoice lock room dg area structural works ows pit road drain fencing dismantle of facilities allied work at existing dimapur depot signal basti nagaland

Const of buildings control pmcc bldg store room driver rest fan room toilet block invoice lock room dg area structural works ows pit road drain fencing dismantle of facilities allied work at existing dimapur depot signal basti nagaland

Read more
Installation of 02 nos new ci pulleys diameter - 0.65 mtr at 06 no pit head gear structure and dismantling of two nos head gear pulleys for safe lowering and lifting of submersible pump motor set in 06 no pit kb 5/6 pits colliery

Installation of 02 nos new ci pulleys diameter - 0.65 mtr at 06 no pit head gear structure and dismantling of two nos head gear pulleys for safe lowering and lifting of submersible pump motor set in 06 no pit kb 5/6 pits colliery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise