Tender Details
Particulars | Details |
---|---|
Title |
Routine Maintenance And Incident Management Of Two Laning With Paved Shoulders Of Bihar Sharif Barbigha Mokama Section Of Nh 82 From Design Chainage Km. 94.478 (Existing Chainage Km. 119.320 Of Nh 31) To Km. 149.053 (Existing Chainage Km. 149.000 O
|
Description |
Routine Maintenance And Incident Management Of Two Laning With Paved Shoulders Of Bihar Sharif Barbigha Mokama Section Of Nh 82 From Design Chainage Km. 94.478 (Existing Chainage Km. 119.320 Of Nh 31) To Km. 149.053 (Existing Chainage Km. 149.000
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_225064_1 |
Reference Number |
NIT No- 266/RO-PATNA/NHAI/2024-25 |
Tender Fee | 25000 |
EMD | 3.37 Lakh |
Tender Value | |
Place | NHAI, RO - Patna |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=251787 |
Start Date | January 28, 2025 19:40 |
End Date |
24/02/2025 ( Expired 57 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreAnnual maintenance and incident management of gozaria-prantij section from km 558.200 to km 595.585 on nh-68 in the state of gujarat.
Annual maintenance and incident management of gozaria-prantij section from km 558.200 to km 595.585 on nh-68 in the state of gujarat.
Read moreof your Industry type