Tender Details

Particulars Details
Title
Laying Of Hdpe/Di Pipeline, Horizontal Boring By Hdd Method, Bridge And Culvert Crossing, Providing Fhtc, Specials Repair With Trial Of Pipeline And Allied Works At Chuniajhora Pwss Under Alipurduar Division, Phe Dte.
Description
Laying Of Hdpe/Di Pipeline, Horizontal Boring By Hdd Method, Bridge And Culvert Crossing, Providing Fhtc, Specials Repair With Trial Of Pipeline And Allied Works At Chuniajhora Pwss Under Alipurduar Division, Phe Dte.&Amp#X0d &Amp#X0d
Organisation PHE | State Govt. and UT
Tender Id 2023_PHED_628560_4
Reference
Number
-
Tender Fee 0
EMD 38850
Tender Value -
Place ALIPURDUAR
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1344039

Start Date December 22, 2023 19:30
End Date
Expired 09/01/2024

Expired 1011 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Laying 6.625in od pipeline with / without ofc conduit through horizontal directional drilling method hdd for crossing across beas river in extension of panipat jalandhar lpg pipeline pjpl from jalandhar to goindwal sahib bottling plant

Laying 6.625in od pipeline with / without ofc conduit through horizontal directional drilling method hdd for crossing across beas river in extension of panipat jalandhar lpg pipeline pjpl from jalandhar to goindwal sahib bottling plant

Read more
Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh

Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh

Read more
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira

Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).

Read more
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira

Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).

Read more
Pipeline installation by hdd method

Pipeline installation by hdd method&#x0d across five nos. crossings for krishnagiri&#x0d coimbatore pipeline phase-i project of m/s gail

Read more
Laying of hdpe/di pipeline for filling up the gap and bridge / culvert crossing, specials repair with trial of pipeline and allied works at shrinnathpur tg pwss under alipurduar division, phe dte.

Laying of hdpe/di pipeline for filling up the gap and bridge / culvert crossing, specials repair with trial of pipeline and allied works at shrinnathpur tg pwss under alipurduar division, phe dte.&amp#x0d &amp#x0d

Read more
Laying of hdpe/di pipeline for filling up the gap and bridge / culvert crossing, specials repair with trial of pipeline and allied works at sankosh tg pwss under alipurduar division, phe dte.

Laying of hdpe/di pipeline for filling up the gap and bridge / culvert crossing, specials repair with trial of pipeline and allied works at sankosh tg pwss under alipurduar division, phe dte.&amp#x0d &amp#x0d

Read more
Tube well boring by odex-165 method of drilling, construction of pump house, boundary wall at proposed 6th site of samuktala pwss under alipurduar division, phe dte.

Tube well boring by odex-165 method of drilling, construction of pump house, boundary wall at proposed 6th site of samuktala pwss under alipurduar division, phe dte.

Read more
Laying of rising main line hdpe pn10, horizontal boring by hdd method, bridge and culvert crossing, construction of pathway, surface drain and chatal, installation of paver block along with the others allied works at loknathpur pwss under alipurduar

Laying of rising main line hdpe pn10, horizontal boring by hdd method, bridge and culvert crossing, construction of pathway, surface drain and chatal, installation of paver block along with the others allied works at loknathpur pwss under alipurduar

Read more
Pipeline installation by hdd method for kcpl ph-ii of gail

Pipeline installation by hdd method across seven nos crossings for phase-ii project of m/s gail

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise