Tender Details
Particulars | Details |
---|---|
Title |
Conical Flask,Air Condenser,Centrifuge Tubes,Micropipette 5 Ml And Compatible Tips,Micropipette 1 M
|
Description |
|
Organisation | Department of Agriculture Cooperation and Farmers Welfare | Ministry of Agriculture and Farmers Welfare |
Tender Id | GEM/2025/B/5826859 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 16, 2025 20:15 |
End Date |
06/02/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing bt road and cd works on road from rachachakota to mallapur (km 1/500 to 5/00 of mamada (m) in nirmal district
Providing bt road and cd works on road from rachachakota to mallapur (km 1/500 to 5/00 of mamada (m) in nirmal district
Read moreSupply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap&#x0d (6) cylinder with brass line
Read moreHelium leak test of condenser and associated negative pressure parts and valves for individual units of 1 to 5, bktps before overhauling or shutdown of respective units and or as per requirement.
Helium leak test of condenser and associated negative pressure parts and valves for individual units of 1 to 5, bktps before overhauling or shutdown of respective units and or as per requirement.
Read moreExcavating over areas exc 1 point 5 m deep and,excavating over areas exc 1 point 5 m deep,ml for mo
Read more
Selection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-5, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Selection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-5, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Read moreProcurement of hanger block for bolster suspension of m/coach. to icf drg no. emu/m-0-5-006, alt- s/2 (small- s/2) & rdso s str no.c-k-202.amendment slip no.1 of aug.2002.etc
For complete deion and other details, please refer to tender
Read moreOperation and maintenance of strom water pump under sd-1/m-2511 delhi (sh- repairing and rewinding of vrs pump houses at ghamdi pusta, ghamdi gao, c-12, c-5, sbs, dividing road, gurudwara road seelampur and bhajanpura)
Operation and maintenance of strom water pump under sd-1/m-2511 delhi (sh- repairing and rewinding of vrs pump houses at ghamdi pusta, ghamdi gao, c-12, c-5, sbs, dividing road, gurudwara road seelampur and bhajanpura)
Read moreA/r and m/o road under swr-ii, pwd, during 2025-26 (sh- repair/replacement of defective retro reflective overhead signage board sheet under jurisdiction of sub-division-1, sub-division-2, sub-division-3, sub-division-4, sub-division-5).
A/r and m/o road under swr-ii, pwd, during 2025-26 (sh- repair/replacement of defective retro reflective overhead signage board sheet under jurisdiction of sub-division-1, sub-division-2, sub-division-3, sub-division-4, sub-division-5).
Read moreProviding installation and commissioning of 1 5 tr 2 0 tr split type air conditioning system in different locations of renovated old gynae ot cum labour room dept of obstetrics and gynaecology of agmc and gbp hospital agartala
Providing installation and commissioning of 1 5 tr 2 0 tr split type air conditioning system in different locations of renovated old gynae ot cum labour room dept of obstetrics and gynaecology of agmc and gbp hospital agartala&#x0d &#x0d
Read moreEddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025
Eddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025
Read moreof your Industry type