Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr Maintenance Of Pwd Road Beside Babul Chowmuhani Bazar Under Amtali Sub Division During The Year 2024 25 Sh Construction Of Rcc Drain, Cross Drain, Approach Road Etc At Babul Chowmuhani
|
| Description |
Fdr Maintenance Of Pwd Road Beside Babul Chowmuhani Bazar Under Amtali Sub Division During The Year 2024 25 Sh Construction Of Rcc Drain, Cross Drain, Approach Road Etc At Babul Chowmuhani
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_54153_1 |
|
Reference Number |
62_R_EE_BSLD_PWD(RnB)_2024_25 |
| Tender Fee | 1000 |
| EMD | 24142 |
| Tender Value | - |
| Place | Babul Chowmuhani |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=55013 |
| Start Date | October 28, 2024 22:00 |
| End Date |
Expired
18/11/2024
Expired 692 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fdr_maintenance of pwd road from hospital chowmuhani to abhoy ashram (l_200 mtr) under amtali pwd(rnb) sub division during the year 2024_25 _sh patch soling, wbm, carpeting, rcc drain and other allied works
Fdr_maintenance of pwd road from hospital chowmuhani to abhoy ashram (l_200 mtr) under amtali pwd(rnb) sub division during the year 2024_25 _sh patch soling, wbm, carpeting, rcc drain and other allied works
Read moreMaintenance of pwd road from amtali school to azachak ashram (l_0 point 55 km) and chowmuhani bazar to narayan khamar (l_3 point 50 km) under amtali pwd (rnb) sub division during the year 2025_26
Sh_patch repairing, patch metalling, carpeting, premix seal coat, construction of pucca drain etc&#x0d &#x0d
Read moreMaintenance of pwd road from darogabari to hospital chowmuhani road (l_0point90 km) under amtali pwd (rnb) sub division during the year 2024_25_sh patch repairing, patch metalling, carpeting, premix seal coat, repairing of pucca drain etc
Maintenance of pwd road from darogabari to hospital chowmuhani road (l_0point90 km) under amtali pwd (rnb) sub division during the year 2024_25_sh patch repairing, patch metalling, carpeting, premix seal coat, repairing of pucca drain etc
Read moreMaintenance of road from chandibari nabintilla road near sekerkote railway station (l_1 point10 km) at chowmuhani bazar gp under amtali pwd (rnb) sub_division during the year 2025_26
Patch metalling, patch repairing bm and carpeting, premix seal coat by mechanical means with other allied works
Read moreFdr to the pwd road from chowmuhani bazar to surjyamaninagar elect sub-station (l_3 point 70 km) under amtali pwd (rnb) sub division during the year 2025_26
Sh_patch repairing, patch metalling, carpeting, premix seal coat and other allied works (portion from ch 1 point 40 km to 2 point 50 km).
Read moreFdr maintenance of road from amtali bazar to beltali chowmuhani via kalitila pump house and radheshyam chowmuhani..pwd(r and b) khayerpur sub division during the year 2024 25 sh construction of 01 no box culvert (2nd call)
Fdr maintenance of road from amtali bazar to beltali chowmuhani via kalitila pump house and radheshyam chowmuhani..pwd(r and b) khayerpur sub division during the year 2024 25 sh construction of 01 no box culvert (2nd call)
Read morePeriodical repair of pwd road from babul chowmuhani nh08 to 19 card l1point50 km during the year 2023 24/ sh patch wbm grouting carpeting premix seal coat etc with other necessary works under amtali sub-division
Periodical repair of pwd road from babul chowmuhani nh08 to 19 card l1point50 km during the year 2023 24/ sh patch wbm grouting carpeting premix seal coat etc with other necessary works under amtali sub-division
Read moreMaintenance of pwd road from i babul chowmuhani -fultali road to haripur dead end via dr abhijits house l- 0 point 90km) and ii approach of azachok ashram road with nh-08 l- 0 point 50km under amtali pwd randb sub-division during the year 2024-25 /
Maintenance of pwd road from i babul chowmuhani -fultali road to haripur dead end via dr abhijits house l- 0 point 90km) and ii approach of azachok ashram road with nh-08 l- 0 point 50km under amtali pwd randb sub-division during the year 2024-25 /
Read moreMaintenance of pwd road from babul chowmuhani to 19 card road (l_3point70 km) under amtali pwd (rnb) sub division during the year 2024_25_sh_providing and erecting of crash barrier to either side of rob at ch 3point50 km
Maintenance of pwd road from babul chowmuhani to 19 card road (l_3point70 km) under amtali pwd (rnb) sub division during the year 2024_25_sh_providing and erecting of crash barrier to either side of rob at ch 3point50 km
Read moreReplacement of bailey bridge by rcc bridge over ratacherra and juricherra on mdf road in between kanchanbari to chowmuhani bazar and fatikroy to chowmuhani bazar during the year 2023 24 sh strengthening of approach road of rcc bridges two 02 nos by
Replacement of bailey bridge by rcc bridge over ratacherra and juricherra on mdf road in between kanchanbari to chowmuhani bazar and fatikroy to chowmuhani bazar during the year 2023 24 sh strengthening of approach road of rcc bridges two 02 nos by
Read moreof your Industry type