Tender Details
Particulars | Details |
---|---|
Title |
Dnit For Laying Of Pipe Line From Kabir Minor To Gaushala At Village Kabrel And All Other Works Contingent Thereto
|
Description |
Dnit For Laying Of Pipe Line From
Kabir Minor To Gaushala At Village Kabrel And All
Other Works Contingent Thereto
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_306942_1 |
Reference Number |
EE Memo No. 13238 Dated 23/08/2023 |
Tender Fee | 1000 |
EMD | 38800 |
Tender Value | |
Place | O/O EE PHED No.1 Hisar |
Link | https://etenders.hry.nic.in |
Start Date | August 28, 2023 20:30 |
End Date |
11/09/2023 ( Expired 610 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConsultancy services for hazard and vulnerability assessment from km 11.8 (rajban) to km 103.55 (fediz) of nh-707 and dpr for remedial measures for prion of landslides at identified locations / chainages of nh 707 in state of himachal pradesh
Consultancy services for hazard and vulnerability assessment from km 11.8 (rajban) to km 103.55 (fediz) of nh-707 and dpr for remedial measures for prion of landslides at identified locations / chainages of nh 707 in state of himachal pradesh
Read moreSpl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Spl repair /replacement of distribution water supply ci pipe line to di pipe line at zone a, c, e, o and q area at rangapahar military station
Read moreSupply of vehicle for garbage collection and transportation from all villages under gram panchayat humfrygunj to slwm cluster wandoor
Supply of vehicle for garbage collection and transportation from all villages under gram panchayat humfrygunj to slwm cluster wandoor
Read more06/4
Construction of approach road and other allied works at kultali glr under augmentation of laying distribution system to extend the benefit of 100 p household in zone-i at kultali block within mega surface water based supply scheme of falta-mathurapur
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Laying of tower foundations, erection of towers, stringing and sagging of conductor for 220 kv d/c line from 400 kv s/s pgcil patiala to 220 kv s/s bhadson (to be upgraded from 66 kv s/s).
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreof your Industry type