Tender Details
Particulars | Details |
---|---|
Title |
Sitc And Operation And Maintenance Of Advanced Traffic Management System (Atms) On National Highway 92, 730 B, 730 C, And 731 K From Etawah To Pilibhit (Length 240.726 Km.)In The State Of Up (Gnhcp) With Loan Assistance Of World Bank On Epc Mode
|
Description |
Sitc And Operation And Maintenance Of Advanced Traffic Management System (Atms) On National Highway 92, 730 B, 730 C, And 731 K From Etawah To Pilibhit (Length 240.726 Km.)In The State Of Up (Gnhcp) With Loan Assistance Of World Bank On Epc Mode
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 40.24 Lakh |
Tender Value | |
Place | Etawah to Pilibhit |
Link |
AAAAAAAAAA Login to view |
Start Date | May 17, 2025 18:00 |
End Date |
17/06/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Rehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Read moreSitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Read morePre bid eoi for selection of pre-bid partner for supply installation testing commissioning and operation and maintenance of advance traffic management system on national highway 730b, 730c and 731k from bewar to pilibhit in the state of uttar pradesh
Pre bid eoi for selection of pre-bid partner for supply installation testing commissioning and operation and maintenance of advance traffic management system on national highway 730b, 730c and 731k from bewar to pilibhit in the state of uttar pradesh
Read moreRehabilitation and up-gradation for yedshi-latur road section of stretch, nh- 63, ing from ch. 24-350 to ch. 61-875 km (length-37.525 km) to 4lps in the state of maharashtra on epc mode.
Rehabilitation and up-gradation for yedshi-latur road section of stretch, nh- 63, ing from ch. 24-350 to ch. 61-875 km (length-37.525 km) to 4lps in the state of maharashtra on epc mode.
Read moreBalance works of rehabilitation and upgradation to 4-lane configuration of ras-beawar section (km 0.000 to km 30.050) of nh-158 in the state of rajasthan under gnhcp with the loan assistance of world bank on epc mode.
Balance works of rehabilitation and upgradation to 4-lane configuration of ras-beawar section (km 0.000 to km 30.050) of nh-158 in the state of rajasthan under gnhcp with the loan assistance of world bank on epc mode.
Read moreValley side protection works from ch. 25.80 km to km 26.65, km 26.75 to km 27.20 and 27.41 km to 27.48 km to restore damages by flash flood in 2023 of nh-10 under national highway division -ix in the dist. of kalimpong on epc mode - 2nd call, job-548
Valley side protection works from ch. 25.80 km to km 26.65, km 26.75 to km 27.20 and 27.41 km to 27.48 km to restore damages by flash flood in 2023 of nh-10 under national highway division -ix in the dist. of kalimpong on epc mode - 2nd call, job-548
Read moreConsultancy services for authority engineer and pmc for supervision of rehabilitation and up- gradation to four lane road from km. 70.500 to km. 78.600 of nh-92 under epc mode in the state of uttar pradesh on epc.
Consultancy services for authority engineer and pmc for supervision of rehabilitation and up- gradation to four lane road from km. 70.500 to km. 78.600 of nh-92 under epc mode in the state of uttar pradesh on epc.
Read moreConsultancy services for road user satisfaction survey and preparation of gender action plan for the projects under green national highways corridor project (gnhcp) with the loan assistance of world bank on epc mode.
Consultancy services for road user satisfaction survey and preparation of gender action plan for the projects under green national highways corridor project (gnhcp) with the loan assistance of world bank on epc mode.
Read moreof your Industry type