Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Spares Of Braun Make For Speed Measuring And Monitoring Instruments For Stgae 2 3 4 And 5 And Hydro Plant
|
Description |
Procurement Of Spares Of Braun Make For Speed Measuring And Monitoring Instruments For Stgae 2 3 4 And 5 And Hydro Plant
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | NTPC_R3_0000116338 |
Reference Number |
9900295654 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Simhadri Super Thermal Power , P.O. SIMHADRI , 531020 , VISAKHAPATNAM , Andhra Pradesh |
Link | http://www.ntpctender.com/ |
Start Date | January 21, 2025 14:30 |
End Date |
27/01/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreProcurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreBiennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreBiennial rate contract for 4 nos. manpower supply for assistance of condition based monitoring of critical inst. coal sampling from coal pipe and misc work, mp dept.
Biennial rate contract for 4 nos. manpower supply for assistance of condition based monitoring of critical inst. coal sampling from coal pipe and misc work, mp dept.
Read moreMachinery spares 1,machinery spares 2,machinery spares 3,machinery spares 4,machinery spares 5,mach
Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreFor the financial year 2025-26 rod / ring repair (making) of sluice valve of 3 inch, 4 inch, 5 inch, 6 inch, 8 inch, 10 inch, 12 inch pipeline located at different places of the city
For the financial year 2025-26 rod / ring repair (making) of sluice valve of 3 inch, 4 inch, 5 inch, 6 inch, 8 inch, 10 inch, 12 inch pipeline located at different places of the city
Read moreof your Industry type