Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Erection, Commissioning And Trial Operation Of Main Circulating Cooling Water, Auxiliary Cooling Water And Lp Piping Including Supply And Installation Of Items As Per Boq Of 2 X800 Mw Ntpc Singrauli Stage Iii Project
|
Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 20 Lakh |
Tender Value | |
Place | 2X800 MW NTPC Singrauli Stage III Project |
Link |
AAAAAAAAAA Login to view |
Start Date | July 04, 2025 15:30 |
End Date |
11/07/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewErection, commissioning and trial operation of main circulating cooling water, auxiliary cooling water and lp piping including supply and installation of items as per boq of 2x800 mw ntpc singrauli stage iii project
Read moreCarrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Carrying out mechanical works in connection with fabrication, erection, testing and commissioning of petroleum product and fire hydrant piping, supply installation, testing and commissioning of mechanized oil water separator, along with allied works
Read moreSupply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Supply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Read morePlanning, design, supply, installation, implementation, commissioning, integration and maintenance of items as part of network operation centre, data centres and security operations centre under nfs unms project for rywide armed forces ngn
Planning, design, supply, installation, implementation, commissioning, integration and maintenance of items as part of network operation centre, data centres and security operations centre under nfs unms project for rywide armed forces ngn on tu
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreDust suppression and water systems package for singrauli stpp stage-iii (2x800 mw)
Dust suppression and water systems package for singrauli stpp stage-iii (2x800 mw)
Read moreDismantling, installation and commissioning of water cooling strainer system for 2x11.25mw ganvi power house stage 1.under ganvi power house division jeori
Dismantling, installation and commissioning of water cooling strainer system for 2x11.25mw ganvi power house stage 1.under ganvi power house division jeori
Read moreSupply erection and commissioning of 300 nb quick filling interconnection pipe line fittings for cooling water tunnel of unit i to iii from north end in cwph i
Supply erection and commissioning of 300 nb quick filling interconnection pipe line fittings for cooling water tunnel of unit i to iii from north end in cwph i
Read moreSupply erection and commissioning of 300 nb quick filling interconnection pipe line and fittings for cooling water tunnel of unit i to iii from south end in cwph i
Supply erection and commissioning of 300 nb quick filling interconnection pipe line and fittings for cooling water tunnel of unit i to iii from south end in cwph i
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreof your Industry type