Tender Details
Particulars | Details |
---|---|
Title |
Nctps Ii Civil Maintenance Circle Civil Maintenance Division Operation And Maintenance Of Sewage Treatment Plant Inside Nctps Ii For The Period Of One Year From 01.04.2025 Or From The Date Of Commencement
|
Description |
Nctps Ii Civil Maintenance Circle Civil Maintenance Division Operation And Maintenance Of Sewage Treatment Plant Inside Nctps Ii For The Period Of One Year From 01.04.2025 Or From The Date Of Commencement
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_529978_1 |
Reference Number |
CE/NCTPS-II/SE/CM/111/2024-25 |
Tender Fee | 0 |
EMD | 4600 |
Tender Value | |
Place | NCTPS II |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631008 |
Start Date | March 05, 2025 19:30 |
End Date |
19/03/2025 ( Expired 78 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreRfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDesign, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Read moreof your Industry type