Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Double Line Track (3rd &Amp 4th Line) Formation Including Earth Work, Blanketing, Minor Bridges, Major Bridges, Important Bridges, Rfo Works, Track Works, Station Building, Electrification Works, Trd Works (2x25 Kv), Signal And Telecom Works And Other Miscellaneous Works For 32.5 T Indian Railway Standard Loading In Gaya Detour Section (In Between Dfcc Ch: 179.200 (Near New Paharpur) To Dfcc Ch:225.300 (Near New Kastha) In Dhn And Dhn Division Of East Central Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72831381 |
|
Reference Number |
ECR-CAO-C-S-EPC-06-23-24 |
| Tender Fee | 0 |
| EMD | 2 Crore |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72831381/viewNitPdf_4439249.pdf |
| Start Date | December 31, 2023 00:07 |
| End Date |
Expired
21/02/2024
Expired 968 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreEngineering, procurement and construction (epc) for construction of double line track (3rd & 4th line) formation including earth work, blanketing, minor bridges, rub, major bridges, important bridges, rfo works, track works, station building, electrification works, trd works (2x25 kv) and other miscellaneous works for 32.5t indian railway standard loading in gaya detour section (in between dfcc ch: 183.680 (ir ch:434.426) (near koderma detour end) to dfcc ch:225.300 (near new kastha)
For complete deion and other details, please refer to tender
Read moreRequest for proposal (rfp) for appointment of authority engineer for providing project management services for construction of double line track (3rd & 4th line) formation including earth work, blanketing, minor bridges, major bridges, important bridges, rfo works, track works, station building, electrification works, trd works (2x25 kv), signal and telecom works and other miscellaneous works for 32.5t indian railway standard in connection with multi-tracking work for sonnagarandal section
For complete deion and other details, please refer to tender
Read moreAerial topographical survey using dgps based integrated drone and other field works for final location survey for koderma-paharpur detour line of proposed sonnagar-andal multi track (3rd 4th line)
Aerial topographical survey using dgps based integrated drone and other field works for final location survey for koderma paharpur detour line of proposed sonnagar andal multitrack (3rd 4th line)
Read moreAerial topographical survey using dgps based integrated drone and other field works for final location survey for koderma paharpur detour line of proposed sonnagar andal multi track (3rd 4th line)
Aerial topographical survey using dgps based integrated drone and other field works for final location survey for koderma paharpur detour line of proposed sonnagar andal multi-track (3rd 4th line)
Read moreCutting, felling, transportation and deposition of tree to the nearest forest depot including obtaining of all clearance/permission from forest authority in connection with construction of 3rd and 4th double line track in dhanbad division of east central railway from koderma to paharpur (koderma-detour).
For complete deion and other details, please refer to tender
Read moreComposite works (civil & electrical) involving earthwork, blanketing, p.way work, minor& major bridge work, robs/lhs, retaining wall, shifting of utilities, station buildings, quarters, drain, road di, supply and spreading of ballast, supply of p.way materials, linking of track and other p.way work and other ancillary associated civil engineering works and supply, installation, testing and commissioning in connection to electrification with 2x25 kv ohe system and electrical ge
For complete deion and other details, please refer to tender
Read moreof your Industry type