Quantum Of Works For Construction Of New 11 Kv Line And S/S For Lt Releasing Connection Under Full Deposit Scheme In The Area Of E.D.S.D. Purwa And Maurawan Under Electricity Distribution Division Iii, Purwa, Unnao.
Description
Quantum Of Works For Construction Of New 11 Kv Line And S/S For Lt Releasing Connection Under Full Deposit Scheme In The Area Of E.D.S.D. Purwa And Maurawan Under Electricity Distribution Division Iii, Purwa, Unnao.
Organisation Madhyanchal Vidyut Vitran Nigam Ltd | State Govt. and UT
Tender Id 2025_MVVNL_1016916_1
Reference
Number
160/E.D.C./Unnao/2024-25
Tender Fee 1180
EMD 10000
Tender Value
Place Unnao
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1833067
Start Date March 27, 2025 21:10
End Date

07/04/2025 ( Expired 33 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme

Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme

Read more
Procurement of various type of connectors, p.g. clamps and jaw for maintenance work at various 132 kv substation of electricity transmission sub division-i, mohaddipur, gorakhpur under etd-i, gorakhpur

Procurement of various type of connectors, p.g. clamps and jaw for maintenance work at various 132 kv substation of electricity transmission sub division-i, mohaddipur, gorakhpur under etd-i, gorakhpur

Read more
Under the electricity distribution division, khalilabad, replacement of burnt and damaged transformers, unloading and loading by crane for quick installation of transformers.

Under the electricity distribution division, khalilabad, replacement of burnt and damaged transformers, unloading and loading by crane for quick installation of transformers.

Read more

Allied work for laying of distribution system, refixing the exising fhtc connection on new distribution system and construction of platform for augmentation of dogachhi (zone-i) water supply scheme of jangipur sub division under murshidabad divisio

Read more
Work of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar

Work of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar

Read more
Work of meter installation on new single phase connections of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of ee edd-iv (buxa) jaunpur.

Work of meter installation on new single phase connections of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of ee edd-iv (buxa) jaunpur.

Read more
Work of meter installation on new single phase connections of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of ee edd-i (kerakat rural) jaunpur.

Work of meter installation on new single phase connections of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of ee edd-i (kerakat rural) jaunpur.

Read more
Work of meter installation on new single phase connections of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of ee edd-iii (jaunpur nagar) jaunpur.

Work of meter installation on new single phase connections of 01 to 04 kw for jhatpat/niveshmitra applied consumers and others under deposit scheme in the area of ee edd-iii (jaunpur nagar) jaunpur.

Read more
Extension of distribution pipe line connecting existing household connection with distribution pipeline in various villages as per site requirement and other appurtenant works under dewalchaura gov pumping water supply scheme

Extension of distribution pipe line connecting existing household connection with distribution pipeline in various villages as per site requirement and other appurtenant works under dewalchaura gov pumping water supply scheme

Read more
- installation of 33 kv metering and protective equipment at the premises of m/s shree ambey for effecting the new 33 kv bulk connection under bankura division, wbsedcl

- installation of 33 kv metering and protective equipment at the premises of m/s shree ambey for effecting the new 33 kv bulk connection under bankura division, wbsedcl