Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Boiler Furnace Tube,Boiler Economiser Tube
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2023/B/3582106 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 23, 2023 20:34 |
| End Date |
Expired
05/07/2023
Expired 1199 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AMARDEEP STEEL CENTRE LLP | - | 04-07-2023 18:24:31 | MSE | Evaluated |
| 2 | ANAND SEAMLESS LIMITED | - | 04-07-2023 16:54:53 | MSE | Evaluated |
| 3 | BRACKER INDIA | - | 04-07-2023 17:04:15 | N/A | Evaluated |
| 4 | Dehgamwala & Sons | - | 03-07-2023 15:59:45 | N/A | Evaluated |
| 5 | JAGANNATHAN ENGINEERING WORKS | - | 24-06-2023 12:33:41 | MSE | Evaluated |
| 6 | MAHALAXMI METAL CORPORATION | - | 03-07-2023 18:22:12 | MSE | Evaluated |
| 7 | S K M OVERSEAS | - | 04-07-2023 13:06:15 | N/A | Evaluated |
| 8 | SAINEST TUBES PRIVATE LIMITED | - | 05-07-2023 12:57:53 | N/A | Evaluated |
| 9 | THE BOILER COMPONENTS MFG.CO | - | 04-07-2023 16:02:31 | MSE | Evaluated |
| 10 | VADODARA INDUSTRIAL SERVICES | - | 26-06-2023 14:49:02 | MSE | Evaluated |
Supply of boiler tube protection shielding for economiser zone in boiler of 2x660 mw, csctpp,chhabra
Supply of boiler tube protection shielding for economiser zone in boiler of 2x660 mw, csctpp,chhabra
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit fabrication work of economiser tube for 20 tph boiler service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit fabrication work of economiser tube for 20 tph boiler service provider
Read moreMicrocertrifuge,tube furnace,uv- vis spectrophotometer
Microcertrifuge,tube furnace,uv- vis spectrophotometer
Read moreRoof wall tube,furnace rear sling tube straight,tube,platen sh tube,sling tube,sling tube,platen sh tube
Roof wall tube,furnace rear sling tube straight,tube,platen sh tube,sling tube,sling tube,platen sh tube
Read moreExpression of interest for enlistment of industrial water tube boiler package (item category-06bb) for industrial water tube boiler package
Expression of interest for enlistment of industrial water tube boiler package (item category-06bb) for industrial water tube boiler package
Read morePurchase of working tube for vertical furnace along with product collection setup
Purchase of working tube for vertical furnace along with product collection setup
Read morePot for salt bath furnace as per drawing no. tend 2623 material - boiler steel. reqd. for oft 3578 &
Pot for salt bath furnace as per drawing no. tend 2623 material - boiler steel. reqd. for oft 3578 &
Read moreRemoval of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Read moreof your Industry type