Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling, Transportation, Unloading And Assembling Assistance Of 01 No Bg 825 Motor Grader From Rajmahal Ocp To Sonepur Bazari Project
|
Description |
Dismantling, Transportation, Unloading And Assembling Assistance Of 01 No Bg 825 Motor Grader From Rajmahal Ocp To Sonepur Bazari Project
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_311482_1 |
Reference Number |
GM/SBA/EXCV/e-Tender/24-25/39 |
Tender Fee | 0 |
EMD | 2900 |
Tender Value | |
Place | Sonepur Bazari Area,ECL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322787 |
Start Date | June 29, 2024 22:30 |
End Date |
09/07/2024 ( Expired 348 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Ca no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreSurface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Surface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Read moreWb/pwrd/eenhxii/nit- 03(sl. no.01) of 2025-26
Emergent temporary restoration of nh 14 old nh 60 road from ch 309 100 km to ch 310 400 km in stretches and from 313 800 km to 314 800 km in stretches of suri nh sub division under nh division xii in the district of birbhum
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Read moreNctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Read moreWork repairing n rewiring of electronic road weigh bridges no 01 and 02 to distribute power through three phase 4 wire system as per vigilance guidelines under rohini ocp.
Work repairing n rewiring of electronic road weigh bridge no 01 and 02 to distribute power through three phase 4 wire system as per vigilance guidelines under rohini ocp.
Read moreDrilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1.2nd call
Drilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1.2nd call.
Read moreConstruction of c.c. road and r.c.c. drain from buddha vihar to samir pathan house and both side r.c.c. covered drain from sudhakar nimsarkar to mahendra urade in prabhag no. 01 for nagar panchayat pombhurna dist. chandrapur
Construction of c.c. road and r.c.c. drain from buddha vihar to samir pathan house and both side r.c.c. covered drain from sudhakar nimsarkar to mahendra urade in prabhag no. 01 for nagar panchayat pombhurna dist. chandrapur
Read moreof your Industry type