Tender Details

Particulars Details
Title
Construction Of Coal Transportation Road From Amdiha To Pahargora Along North Side Of Ob Dump Of Mohanpur Ocp Under Salanpur Area.
Description
Construction Of Coal Transportation Road From Amdiha To Pahargora Along North Side Of Ob Dump Of Mohanpur Ocp Under Salanpur Area.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_341396_1
Reference
Number
SLN/GM/AE(C)/E-Tender/25-26/27 dt 12.08.2025
Tender Fee 0
EMD 3.6 Lakh
Tender Value -
Place Mohanpur OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353893

Start Date August 14, 2025 15:30
End Date
Expired 29/08/2025

Expired 409 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Shifting of shiv mandir from mohanpur mine to pahargora near mohanpur ocp under salanpur area.

Shifting of shiv mandir from mohanpur mine to pahargora near mohanpur ocp under salanpur area.

Read more
Shifting of shiv mandir from mohanpur mine to pahargora near mohanpur ocp under salanpur area.(re-tender/2nd call).

Shifting of shiv mandir from mohanpur mine to pahargora near mohanpur ocp under salanpur area.(re-tender/2nd call).

Read more
Shifting of ramanuj kunj ashram pahargora of mohanpur colliery under salanpur area

Shifting of ramanuj kunj ashram pahargora of mohanpur colliery under salanpur area.

Read more
Construction of toe wall along ob dump of tetariakhar ocp, rajhara area

Construction of toe wall along ob dump of tetariakhar ocp, rajhara area

Read more
Construction of toe wall along ob dump of tetariakhar ocp, rajhara area

Construction of toe wall along ob dump of tetariakhar ocp, rajhara area

Read more
Power re-organisation of lt over head line at pahargora side of mohanpur colliery under salanpur area.

Power re-organisation of lt over head line at pahargora side of mohanpur colliery under salanpur area.

Read more
Shifting of bishramburi mandir of mohanpur ocp under salanpur area

Shifting of bishramburi mandir of mohanpur ocp under salanpur area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise