Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Maintenance Of Steel Foot Bridge Over Khowai River At Ghilatali Gp Under Kalyanpur Rd Block As Per Pwd So R 2023.
|
Description |
Maintenance Of Steel Foot Bridge Over Khowai River At Ghilatali Gp Under Kalyanpur Rd Block As Per Pwd So R 2023.
|
Organisation | Chief Engineer, Rural Development Department | State Govt. and UT |
Tender Id | 2025_CERDD_57536_1 |
Reference Number |
63/SFB-GGP/KLP/SP/RD/TLM 26/1/25 |
Tender Fee | 1000 |
EMD | 48533 |
Tender Value | |
Place | As per DNIT |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58520 |
Start Date | January 28, 2025 18:50 |
End Date |
04/02/2025 ( Expired 149 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreUpgradation of patiala-sanour road rd-3.60 t0 7.60 kms 4.00km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Upgradation of patiala-sanour road rd-3.60 t0 7.60 kms 4.00km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Read moreUpgradation of northern byepass patiala rd 0.00 t0 4.73 kms 4.73km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Upgradation of northern byepass patiala rd 0.00 t0 4.73 kms 4.73km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Read moreConstruction of cement concrete block pitching etc at moukhali bridge under tambuldaha-i gp of canning-ii block, south 24 parganas
Construction of cement concrete block pitching etc at moukhali bridge under tambuldaha-i gp of canning-ii block, south 24 parganas
Read moreConstruction of paver block road from dewbari hostel to nh of tayab ali wno 3 at kurti gp under 54 kadamtala kurti ac under rd dharmanagar division
Construction of paver block road from dewbari hostel to nh of tayab ali wno 3 at kurti gp under 54 kadamtala kurti ac under rd dharmanagar division
Read moreOperation and maintenance (o and m) of three (03) nos of foot over bridges (fobs) at uppal( near ida), as rao nagar (near ushodaya super market) and balanagar (near idpl, prashanthnagar) for two (02) years, hyderabad
Operation and maintenance (o and m) of three (03) nos foot over bridges (fobs) at uppal (near ida), a.s rao nagar (near ushodaya super market) and balanagar (near idpl, prashanthnagar) for two (02) years, hyderabad
Read moreConstruction of bagalbati ii anganwadi centre awc no 234 at naugha, khatian no. 784, plot no. 1308 under illambazar dev. block. as per model estimate, ridf xxx
Construction of bagalbati ii anganwadi centre awc no 234 at naugha, khatian no. 784, plot no. 1308 under illambazar dev. block. as per model estimate, ridf xxx
Read moreDesign and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang metaliang chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Design and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang-metaliang-chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Read moreConstruction of rain water harvesting structure at south jumerdhepa high school at nalchar rd block sepahijala district (pwd sor 2023)
Construction of rain water harvesting structure at south jumerdhepa high school at nalchar rd block sepahijala district (pwd sor 2023)
Read moreof your Industry type