Tender Details
Particulars | Details |
---|---|
Title |
Rectification Of Corrugated Card Board Box Triple Wall 7 Ply From Size 560 Mm X 560 Mmx 560 Mm To 520 M
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/5951456 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 14, 2025 22:09 |
End Date |
24/02/2025 ( Expired 90 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreDensification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.294.000 to km.377.000 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Densification of median plantation (advance field preparation, planting and maintenance of fresh and existing median plantation) works from km.294.000 to km.377.000 of hyderabad to bangalore section of nh-44 (old nh-7) (total 83 kms) in ap.
Read moreDoor to door collection, segregation of msw from each establishment and transportation to the mrf centre transfer station processing site in mc dharuhera (for 7 years).
Door to door collection, segregation of msw from each establishment and transportation to the mrf centre transfer station processing site in mc dharuhera (for 7 years).
Read moreSpl repair of 11 x or married accomodation (qtr no from 07 to 12 and 14 to 18 (nce) of no 2 trg bn, beg and centre roorkee
Spl repair of 11 x or married accomodation (qtr no from 07 to 12 and 14 to 18 (nce) of no 2 trg bn, beg and centre roorkee
Read moreCa no. ge af no.1/gur-26/2025-26 repair to leakage/ seepage in bldg no p-144 to p-148 from wall and sunken slab and other associated works in certain qtrs of officers enclave in sekhon vihar area at af stn palam under ge (af) gurgoan no 1
Ca no. ge af no.1/gur-26/2025-26 repair to leakage/ seepage in bldg no p-144 to p-148 from wall and sunken slab and other associated works in certain qtrs of officers enclave in sekhon vihar area at af stn palam under ge (af) gurgoan no 1
Read moreBeautification of outer green belt sector-7 karnal from sai mandir to noor mahal chowk (construction of path with chequred tiles etc and all other works contingent thereto complete in all respect with three year mtc/defect liability period free of co
Beautification of outer green belt sector-7 karnal from sai mandir to noor mahal chowk (construction of path with chequred tiles etc and all other works contingent thereto complete in all respect with three year mtc/defect liability period free of co
Read moreof your Industry type