Tender Details
Particulars | Details |
---|---|
Title |
Supply Including Supervision Of 02 Nos. 11 Kv Outdoor Ring Main Unit At 2 X660 Mw Dvc Raghunathpur Tpp, Phase Ii, West Bengal
|
Description |
Supply Including Supervision Of 02 Nos. 11 Kv Outdoor Ring Main Unit At 2 X660 Mw Dvc Raghunathpur Tpp, Phase Ii, West Bengal
|
Organisation | Bharat Heavy Electricals Limited | Central Govt. Ministry/Department |
Tender Id | 2025_BHEL_793061_1 |
Reference Number |
GEM/2025/B/6079680 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | 2X660 MW DVC RAGHUNATHPUR TPP, PHASE-II, WEST BENG |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1097532 |
Start Date | March 22, 2025 21:50 |
End Date |
01/04/2025 ( Expired 21 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Wbpwd/seitc/nit-02 of 2025-2026
Construction of kurseong campus of presidency university at dowhill, kurseong, darjeeling, west bengal av works audio video system for auditorium, conference room, class room and centralized public address system at main administrative building
Read moreProviding and fixing of 02 nos of big outdoor advertisement led display at main location of nowgong
Providing and fixing of 02 nos of big outdoor advertisement led display at main location of nowgong
Read moreDismantling of existing 19 nos. of 132 kv 3 phase double break type isolators and retrofitting of abb make 19 nos. of 3 phase center break type isolators as per work schedule at 2x45 mw rabs hps barginagar.
Dismantling of existing 19 nos. of 132 kv 3 phase double break type isolators and retrofitting of abb make 19 nos. of 3 phase center break type isolators as per work schedule at 2x45 mw rabs hps barginagar.
Read moreEngineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Engineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Read moreSupply of 02 nos. 33kv circuit breaker (vcb)-3 phase at 220 kv substation,chamba under 220kv oandm division chamba (tg)
Supply of 02 nos. 33kv circuit breaker (vcb)-3 phase at 220 kv substation,chamba under 220kv oandm division chamba (tg)
Read moreStringing of two nos of 33 kv overhead transmission line for providing power supply from bina main switching station to substation a of madhucon construction at bina project
Stringing of two nos. of 33kv overhead transmission line for providing power supply from bina main switching substation to substation of m/s madhucon construction at bina project (ncl)
Read moreInstallation of 11 kv outdoor vcb rmg unit for availing ht supply from tangedco at cda complex chennai unde ge chennai
Installation of 11 kv outdoor vcb rmg unit for availing ht supply from tangedco at cda complex chennai unde ge chennai
Read moreProcurement of spares for m/s qlar technology india private limited banglore (formerly known as m/s schenck process solution india private limited) make gravimetric coal feeder installed in boiler area of unit 4 at 2x660 mw ph-ii, sstpp , dongali
Procurement of spares for m/s qlar technology india private limited banglore (formerly known as m/s schenck process solution india private limited) make gravimetric coal feeder installed in boiler area of unit 4 at 2x660 mw ph-ii, sstpp , dongali
Read moreRefurbishment of stacker reclaimer bucket, repairing of cage frame for ring granulator n fabrication of breaker, upper, lower plate for ring granulator n chain cover of rotary breaker installed at 2x600 mw, chp- stage-i n 2x660 mw chp, stage-ii
Refurbishment of stacker reclaimer bucket, repairing of cage frame for ring granulator n fabrication of breaker, upper, lower plate for ring granulator n chain cover of rotary breaker installed at 2x600 mw, chp- stage-i n 2x660 mw chp, stage-ii
Read moreSupply of 132 kv bus isolator spare parts and related installation work for 132 kv m/s hyosung make gis installed at 400 kv gis s/s sector-123, noida under etd-ii, noida under transmission west zone, meerut
Supply of 132 kv bus isolator spare parts and related installation work for 132 kv m/s hyosung make gis installed at 400 kv gis s/s sector-123, noida under etd-ii, noida under transmission west zone, meerut
Read moreof your Industry type