Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Of Existing Bus Shelter And Proposal Of New Bus Shelter With Tensile Roof At Guindy Sidco 2 In Division 172, Zone 13.
|
| Description |
Dismantling Of Existing Bus Shelter And Proposal Of New Bus Shelter With Tensile Roof At Guindy Sidco 2 In Division 172, Zone 13.
|
| Organisation | Corporation of Chennai | State Govt. and UT |
| Tender Id | 2025_CoC_623218_1 |
|
Reference Number |
B.R.R.C.No. B3 / 3917 / 2025 -2 |
| Tender Fee | 0 |
| EMD | 83000 |
| Tender Value | |
| Place | CHENNAI |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=745204 |
| Start Date | November 21, 2025 21:30 |
| End Date |
Expired
28/11/2025
Expired 205 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
M/o various sports complexes/golf courses (a/r m/o of works at pvsc for the year 2026-27)
Dismantling of existing glass partitions and installation of changing room cubicles in swimming pool washroom area at pvsc.
Read moreProviding and fixing of street light fittings along with its allied accessories at various dark spots in sainik enclave ward no. 112 under west zone. nit no.13 item no.01
Providing and fixing of street light fittings along with its allied accessories at various dark spots in sainik enclave ward no. 112 under west zone.
Read moreReplacement of damaged / rusted existing water supply pipeline (non-di) with di pipe (k-7 / k-9 grade) to pr contamination of drinking water in ward no. 18, division-1b, zone-1, municipal corporation gurugram.
Replacement of damaged / rusted existing water supply pipeline (non-di) with di pipe (k-7 / k-9 grade) to pr contamination of drinking water in ward no. 18, division-1b, zone-1, municipal corporation gurugram.
Read moreReplacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreSupply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hoste
Supply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hostel at csir ccmb
Read moreOmprehensive maint or repair to roof sheeting false ceiling joinery sanitary fittings flooring plastering wall pannelling including internal wiring and other misc wks in otm and md accn of zone a and b at palampur mil stn
Comprehensive maint or repair to roof sheeting false ceiling joinery sanitary fittings flooring plastering wall pannelling including internal wiring and other misc wks in otm and md accn of zone a and b at palampur mil stn
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreReplacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and stp md accn at jak li rc srinagar under ge 970 ews
Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. 
 no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and 
 stp md accn at jak li rc srinagar under ge 970 ews
Read moreDismantling of existing bus shelter and proposal of new bus shelter with tensile roof at guindy race course road in div 172, zone - 13
Dismantling of existing bus shelter and proposal of new bus shelter with tensile roof at guindy race course road in div 172, zone - 13
Read moreof your Industry type