Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🛣️ Invitation For Bids: Widening And Strengthening Of Picchari Tenughat Road 🛣️ The Road Construction Department (Rcd Ein C) Under The State Government And Union Territories Invites Bids For The Widening And Strengthening Of Picchari To Tenughat Road, A Critical Project Spanning The Main Portion (24.759 Km) And The Bypass Portion (1.564 Km), Totaling 26.324 Km Under Road Division, Bokaro. 📅 Bid Submission Deadline: July 12, 2024, 12:00 Pm Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 82,20,000 Interested Contractors Must Possess The Requisite Expertise And Resources To Undertake This Extensive Infrastructure Project. Detailed Bids, Including Technical Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Infrastructure, Road Construction, Widening And Strengthening, Picchari Tenughat Road, Bokaro, Rcd Ein C, Government Tender, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Widening And Strengthening Of Picchari (Jaina More Phusro Pwd Road) To Tenughat (Petarwar Gomia Pwd Road) Road Main Portion (Length 24.759 Km) And Bypass Portion (Length 1.564 Km) (Total Length 26.324 Km) Under Road Division, Bokaro
|
Description |
Widening And Strengthening Of Picchari (Jaina More Phusro Pwd Road) To Tenughat (Petarwar Gomia Pwd Road) Road Main Portion (Length 24.759 Km) And Bypass Portion (Length 1.564 Km) (Total Length 26.324 Km) Under Road Division, Bokaro
|
Organisation | RCD EinC | State Govt. and UT |
Tender Id | 2024_CECOM_86864_1 |
Reference Number |
RCD/ BOKARO/755/F.Y. 2024-25 |
Tender Fee | 10000 |
EMD | 82.2 Lakh |
Tender Value | |
Place | Picchari to Tenughat Road |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=116950 |
Start Date | June 21, 2024 17:30 |
End Date |
12/07/2024 ( Expired 360 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreStrengthening and improvement of roads under world bank aided project tresp in ompi block under amarpur division, pwd (randb). gr-ii
Strengthening and improvement of roads under world bank aided project tresp in ompi block under amarpur division, pwd (randb). gr-ii
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreWidening and strengthening work of sh-37a gurjar thadi to rindliya rampura and pandraheda via baori road in district tonk
Widening and strengthening work of sh-37a gurjar thadi to rindliya rampura and pandraheda via baori road in district tonk
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreof your Industry type