Tender Details
Particulars | Details |
---|---|
Title |
Supply, Installation ,Testing And Commissioning For Con Of 01 No. Hand Operated Valve To Solar Powered Remote Operated Valve Of Koyali Ahmedabad Pipeline(kapl)
|
Description |
Supply, Installation ,Testing And Commissioning For Con Of 01 No. Hand Operated Valve To Solar Powered Remote Operated Valve Of Koyali Ahmedabad Pipeline(kapl)
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id | 2025_WRKYL_183697_1 |
Reference Number |
PWKYT24063 |
Tender Fee | 0 |
EMD | 11100 |
Tender Value | |
Place | Mahisagar Temple,Vasasd, Dist Vadodara |
Link | https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=193924 |
Start Date | February 17, 2025 14:30 |
End Date |
03/03/2025 ( Expired 50 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing and commissioning of e and m works for remodeling of baiyappanahalli depot under package 4 of bmrcl project ph 2a
Supply, installation, testing and commissioning of e and m works for remodeling of baiyappanahalli depot under package 4 of bmrcl project ph 2a
Read moreDesign and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Read moreRequest for proposal for selection of system integrator (erpsi) for supply, installation, commissioning, implementation and support for enterprise resource planning (erp) system at power department sikkim
Request for proposal for selection of system integrator (erpsi) for supply, installation, commissioning, implementation and support for enterprise resource planning (erp) system at power department sikkim
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreDesign, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Read moreSupply installation testing and commissioning of 03 nos. external titanium ss 304 led backlit signboards and 01 no. external directional led signboard at dr. shyama prasad mookerji super specialty hospital, balarampur iit kharagpur
Supply installation testing and commissioning of 03 nos. external titanium ss 304 led backlit signboards and 01 no. external directional led signboard at dr. shyama prasad mookerji super specialty hospital, balarampur iit kharagpur
Read moreof your Industry type