Tender Details
Particulars | Details |
---|---|
Title |
Bangalore Jolarpettai Section: Construction Of Boundary Wall For A Length Of 39.05km In Connection With The Work Of Increasing Speed From 110kmph To 130kmph. Maintenance Period Is 12 Months. (Two Packet)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77955044 |
Reference Number |
25SBC24of17-10-24Item-06 |
Tender Fee | 0 |
EMD | 13.66 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77955044/viewNitPdf_4742404.pdf |
Start Date | October 17, 2024 23:37 |
End Date |
11/11/2024 ( Expired 183 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreConstruction of two (02) nos ramps and boundary wall at aiims kalyani (west bengal) and their maintenance during defect liability period.
Construction of two (02) nos ramps and boundary wall at aiims kalyani (west bengal) and their maintenance during defect liability period.
Read moreOperation and maintenance of coimbatore bypass stretch of two lane with paved shoulder from neelambur to madukkarai km 144.680 to km 170.880 section of nh 544 for a length of 26.200 km in the state of tamil nadu.
Operation and maintenance of coimbatore bypass stretch of two lane with paved shoulder from neelambur to madukkarai km 144.680 to km 170.880 section of nh 544 for a length of 26.200 km in the state of tamil nadu.
Read moreNew construction of banera to narmana via radha swami satsung ghar. length 1.60 km under nabard-xxx year 2024-25 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect liability period)
New construction of banera to narmana via radha swami satsung ghar. length 1.60 km under nabard-xxx year 2024-25 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect liability period)
Read moreConstruction work of interlocking road and drain from the electric transformer towards hariram omare house along the boundary wall behind the government medical college ward no. 12, mu naya patel nagar orai nagar
Construction work of interlocking road and drain from the electric transformer towards hariram omare house along the boundary wall behind the government medical college ward no. 12, mu naya patel nagar orai nagar
Read moreMajor and minor and maintenance reparing work of india mark ii handpump by providind skilled unskilled labour and vehicle with t and p in block aron distt guna for period 12 months
Major and minor and maintenance reparing work of india mark ii handpump by providind skilled unskilled labour and vehicle with t and p in block aron distt guna for period 12 months
Read moreConstruction/extension of field channel at work site astan dara in village chewdara for a length of 210 meters from rd00-210 (with 10 meters f/wall) project, sukhnag-distributaries.
Construction/extension of field channel at work site astan dara in village chewdara for a length of 210 meters from rd00-210 (with 10 meters f/wall).
Read moreConstruction of oht tube well pump house toilet boundary wall and laying and jointing of rising main and distribution system, providing household connection with amr water meter work of sanskrati lok colony water supply scheme under sasci programe
Construction of oht tube well pump house toilet boundary wall and laying and jointing of rising main and distribution system, providing household connection with amr water meter work of sanskrati lok colony water supply scheme under sasci programe
Read moreof your Industry type