Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
At Barn Raising Of Dn/Pf With Replacement Of R.C.C Precast Slab Inside Filling 110m Length Out Of 202m With Providing R.C.C Pile And Wall.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78822513 |
|
Reference Number |
ELEG-OT-1034-2023-24 |
| Tender Fee | 0 |
| EMD | 45000 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78822513/viewNitPdf_4795154.pdf |
| Start Date | December 07, 2024 01:27 |
| End Date |
Expired
03/01/2025
Expired 651 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Electrical work for : gauripur : raising of pf no.1 (450mx8m) with extension of pf no. 1 (110m x8m).
Electrical work for : gauripur : raising of pf no.1 (450mx8m) with extension of pf no. 1 (110m x8m).
Read moreSw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Sw-i:-secunderabad division - bpq-kzj sections: widening/repair of cess ,filling up of low lying areas near toe of bank , providing toe bank, & precast / cast insitu rcc central drain & cross drain hdpe pipe through the railway formation at a required depth to the required slope etc. for a total length of 7.93kms. in sse/p.way/magh&mci section under aden/bpa & aden/rdm sub-division. sw-ii:-bpq - kzj section: cutting the slopes to avoid loose earth filling inside drains and bloc
Read moreof your Industry type