Tender Details
Particulars | Details |
---|---|
Title |
General Ky Ip Acp (Np) 2024 25 Clearingand Desilting Of Villiapally Distributary Canal Between Ch 0/000 Km And Tailend And Thodannur Distributary Canal General Civil Work
|
Description |
Ky Ip Acp (Np) 2024 25 Clearingand Desilting Of Villiapally Distributary Canal&Amp#X0d
Between Ch 0/000 Km And Tailend And Thodannur Distributary Canal &Amp#X0d
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_711002_1 |
Reference Number |
IRR/PI/TR/4931/2024_5_11_10/1 |
Tender Fee | 555 |
EMD | 4464 |
Tender Value | |
Place | Kolathur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1117164 |
Start Date | November 30, 2024 00:25 |
End Date |
06/12/2024 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreEngineering, procurement and construction (epc) agreement for construction of new broad gauge line between chainage 51/500 & chainage 84/000 including railway electrification, civil works, signal & telecommunication works and electrical general services between madhugiri (excl.) & madakasira (excl.) in tumakuru-rayadurga new line project.
For complete deion and other details, please refer to tender
Read morePackage - 1c : construction of roadbed, minor bridges, buildings, installation of track (excluding supply of rails, sleeper & thick web switches), and other civil engineering and general electrical works in connection with new bg railway line between pipaliya nankar (excl.) - budni (incl.) stations (chainages 129.000 - 198.000 km) in indore-budni section of bhopal division west central railway in madhya pradesh state, india
For complete deion and other details, please refer to tender
Read moreConstruction of flyover/vup on ajmer-nagaur section of nh 89 (new nh-58) (i) tehla at km 38/240, (ii) kuchera bypass at km 116/450 and (iii) development of junctions on nh-89 (new nh-58) from km. 0/000 to 148/250 in the state of rajasthan on epc mode
Construction of flyover/vup on ajmer-nagaur section of nh 89 (new nh-58) (i) tehla at km 38/240, (ii) kuchera bypass at km 116/450 and (iii) development of junctions on nh-89 (new nh-58) from km. 0/000 to 148/250 in the state of rajasthan on epc mode
Read moreBalance work for proposed laying of 1200mm dia. rcc spl np 4 class casing pipe across under railway track at km 47/500-600 in between kopar-dombivli by micro tunneling method in place of existing overhead 600 mm dia. kdmc sewer drainage pipe line which is infringing the dfccil route.
For complete deion and other details, please refer to tender
Read moreConstruction of bagoliya feeder rd 0 to 30.6 km. off taking frome left main canal ch. 480(14.40 km) of udaisagar tank tehsil girwa and mavli district udaipur
Construction of bagoliya feeder rd 0 to 30.6 km. off taking frome left main canal ch. 480(14.40 km) of udaisagar tank tehsil girwa and mavli district udaipur
Read moreProvision of fob with ramps at km 68/9-69/0 between garhbaruwari-supaul station in shc-fbg section of spj division.
For complete deion and other details, please refer to tender
Read moreEngineering,procurement and construction (epc) for design , supply , erection , testing , commissioning of 2x25 kv ohe & psi system (tsss,sps&ssps) including electrical general services, engineering & telecommunication works between rayadurga (excl.) (ch:205/463) to pavagada (incl.) (ch:106/000) of tk-rdg section (99.463 rkm/114.145 tkm)
For complete deion and other details, please refer to tender
Read moreHubballi division: gadag-hotgi (gdg-hg) section construction of limited height subway in of lc no.62 km 143/900-144/0 in between wandal-basavanbagewadi (wdl-bsrx) station respectively by box pushing method.
For complete deion and other details, please refer to tender
Read moreHyderabad division - (1) sc-dhne section: pasr - additional loop line with simulataneous reception & despatch facility, (2) sc-dhne section: proposed construction of road under bridge (rub) in lieu of lc no: 33 at km 69/0-100 between shnr-babr stations, (3) sc-dhne section: elimination of manned level crossing gate no 65 at km 122/200-300 by providing rub between mbnr-mqn stations, (4) sc-dhne section: elimination of manned level crossing gate no. 141 at km 258/600-700 by providing rub be
For complete deion and other details, please refer to tender
Read moreof your Industry type