Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Of Elevated Metro Viaduct Of Length 20.527 Kms Between Ug Ramp And Balkum Naka Including Depot Approach Viaduct And Three Special Spans For Thane Integral Ring Metro Project.
|
| Description |
Design And Construction Of Elevated Metro Viaduct Of Length 20.527 Kms Between Ug Ramp And Balkum Naka Including Depot Approach Viaduct And Three Special Spans For Thane Integral Ring Metro Project.
|
| Organisation | Maharashtra Metro Rail Corporation Limited | State Govt. and UT |
| Tender Id | 2025_MMRCL_1185576_1 |
|
Reference Number |
T1-015/C-01/2025 |
| Tender Fee | 1.19 Lakh |
| EMD | 0 |
| Tender Value | - |
| Place | Thane Integral Ring Metro Rail Project |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2057069 |
| Start Date | September 01, 2025 21:30 |
| End Date |
Expired
09/09/2025
Expired 355 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreMaintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Maintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.
Read moreModification of 110 kv/220kv ehv d/c overhead lines at a) ch:11350m near patlipada flyover junction, b) ch :14050m near waghbil station and c) ch: 20950 between balkum naka to balkum pada station, for thane integral ring metro project
Modification of 110 kv/220kv ehv d/c overhead lines at a) ch:11350m near patlipada flyover junction, b) ch :14050m near waghbil station and c) ch: 20950 between balkum naka to balkum pada station, for thane integral ring metro project
Read moreModification of 110 kv/220kv ehv m/c overhead lines at a) ch 14050m near waghbil station and kasarwadavali depot b) 220kv ehv d/c overhead lines at ch 20950 between balkum naka to balkum pada station, for thane integral ring metro project.
Modification of 110 kv/220kv ehv m/c overhead lines at a) ch 14050m near waghbil station and kasarwadavali depot b) 220kv ehv d/c overhead lines at ch 20950 between balkum naka to balkum pada station, for thane integral ring metro project.
Read moreConstruction of elevated walkway under the waterfront development project at saket balkum, thane
Construction of elevated walkway under the waterfront development project at saket balkum, thane
Read moreConstruction of elevated walkway under the waterfront development project at saket - balkum, thane
Construction of elevated walkway under the waterfront development project at saket - balkum, thane
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreCivil maintenance of operational elevated and under ground stations viaduct and two depots
Civil maintenance of operational civil maintenance of operational elevated and under ground stations viaduct and two depots&#x0d of pune metro rail project of mahametro for a period of one year.
Read moreDesign and construction of elevated viaduct and 5 nos. elevated station including architectural finishing, e and m work and special spans from end of ramp after double pulia to barra-8 station and end of ramp in depot to agricultureuniversity station
Design and construction of elevated viaduct and 5 nos. elevated station including architectural finishing, e and m work and special spans from end of ramp after double pulia to barra-8 station and end of ramp in depot to agricultureuniversity station
Read moreEngagement of general consultants for thane integral ring metro project
Engagement of general consultants for thane integral ring metro project
Read moreof your Industry type