Tender Details

Particulars Details
Title
Fixed Wing Uav+ Oblique Rgb Sensor
Description
Organisation Department of Science and Technology (DST) | Ministry of Science and Technology
Tender Id GEM/2024/B/5759572
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date December 31, 2024 18:18
End Date
Expired 21/01/2025

Expired 628 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 250 Lakhs Experience with Gov. Required: Years
Buyer Name: Mohan Ram
Ministry: Ministry Of Science And Technology
Department: Department Of Science And Technology (dst)
Organisation: Survey Of India
Similar Tenders
Procurement of wing shrouds and lip shrouds for 11cum buckets for ex1900 hydraulic shovels at rgocp-iii rg-ii area.

Procurement of wing shrouds and lip shrouds for 11cum buckets for ex1900 hydraulic shovels at rgocp-iii rg-ii area.

Read more
Supply, installation, testing and commissioning of air-conditioning system for engineering and town planning wing at nac building, madhapur, circle-50, kp zone, cmc

Supply, installation, testing and commissioning of air-conditioning system for engineering and town planning wing at nac building, madhapur, circle-50, kp zone, cmc

Read more
Execution of interior works including wooden flooring, workstations, furniture and other allied works in engineering and town planning wing at nac building, madhapur, circle-50, kp zone, cmc

Execution of interior works including wooden flooring, workstations, furniture and other allied works in engineering and town planning wing at nac building, madhapur, circle-50, kp zone, cmc

Read more
Corridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.

Corridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.

Read more
Liquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.

Liquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.

Read more
Bifurcation of 11kv post office feeder emanating from 33/11kv hps ss by erection of 1 no new 11kv outdoor breaker in the 33/11kv hps ss, which includes laying of 1.4 km of 11kv 3x300 sq.mm of xlpe ug cable (double run in begumpet section of greenlands sub-division of greenlands division and the work executed by the construction wing of banjara hills division of banjara hills circle under t and d improvement works under general category

Bifurcation of 11kv post office feeder emanating from 33/11kv hps ss by erection of 1 no new 11kv outdoor breaker in the 33/11kv hps ss, which includes laying of 1.4 km of 11kv 3x300 sq.mm of xlpe ug cable (double run in begumpet section of greenlands sub-division of greenlands division and the work executed by the construction wing of banjara hills division of banjara hills circle under t and d improvement works under general category

Read more
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)

Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14

Read more
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr

Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise