Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Vac, Tvs Along With Electrical And Scada Works For 16 Ug Stations In Corridor 3 Of Phase 2 Cmrl Project Including Tunnel And Ramp Sections Between The Stations
|
| Description |
Vac, Tvs Along With Electrical And Scada Works For 16 Ug Stations In Corridor 3 Including Tunnel And Ramp Sections Between The Stations
|
| Organisation | Chennai Metro Rail Limited - MDB Tenders | Central Govt. Ministry/Department |
| Tender Id | 2024_CMMDB_829183_1 |
|
Reference Number |
CP33/C3-VAC_TVS_02/2024 |
| Tender Fee | 40000 |
| EMD | 7.55 Crore |
| Tender Value | |
| Place | Chennai |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=871317 |
| Start Date | May 29, 2025 14:30 |
| End Date |
Expired
04/06/2025
Expired 377 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreDetail project report (dpr) for property development at metro station entry/ in corridor-3 and 5, cmrl phase-2
Preparation of detail project report (dpr) for property development including market analysis, transactional advice, land use report and tender documents for integrated land parcels at metro station entry/ in corridor-3 and 5, cmrl phase-2.
Read moreTender cum auction for licensing of advertisement rights on piers portals along the corridor 1 2 of phase i its extension in cmrl network
Tender cum auction
 for licensing of advertisement rights on piers portals along the corridor 1 2 of phase i its extension in cmrl network
Read moreDesign manufacture supply installation testing and commissioning of heavy duty escalators and travelators for cmrl phase ii corridor 3 (from madhavaram milk colony metro to sholinganallur metro stations)
Design manufacture supply installation testing and commissioning of heavy duty escalators and travelators for cmrl phase ii corridor 3 (from madhavaram milk colony metro to sholinganallur metro stations)
Read moreDesign manufacture supply installation testing and commissioning of heavy duty machine room less lifts for cmrl phase ii corridor 3 and corridor 5
Corridor 3 (from madhavaram milk colony metro to sholinganallur metro) and corridor 5 (from madhavaram depot metro to koyambedu metro stations including madhavaram depot)
Read moreBid for customer satisfaction and performance survey along with phase 1a mansaroto badi chaupar metro stations 11 metro stations corridor within the 1.5 kilometer radius
Bid for customer satisfaction and performance survey along with phase 1a mansaroto badi chaupar metro stations 11 metro stations corridor within the 1.5 kilometer radius
Read moreDesign validation supply installation testing and commissioning of electrical utility works at identified pd retail and kiosk spaces at cmrl phase-i and phase-i extension stations.
Design validation supply installation testing and commissioning of electrical utility works at identified pd retail and kiosk spaces at cmrl phase-i and phase-i extension stations.
Read moreDesign and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at rukanpura and three underground metro stations including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.
Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at rukanpura and three underground metro stations including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.
Read moreDesign manufacture supply installation testing and commissioning of heavy duty escalators for cmrl phase ii corridor 5 (from madhavaram depot metro to koyambedu metro stations).
Design manufacture supply installation testing and commissioning of heavy duty escalators for cmrl phase ii corridor 5 (from madhavaram depot metro to koyambedu metro stations).
Read more350/mpmrcl/2024/in05 design and construction of twin tunnel up and down by shield tbm, cut and cover, cross passages with or without sump, ramps, seven underground stations
Package in 05 design and construction of twin tunnel up and down by shield tbm, cut and cover, cross passages with or without sump, ramps, seven ug stations including architectural finishing, plumbing as directed by engineer for ug section of indore
Read moreof your Industry type