Tender Details
Particulars | Details |
---|---|
Title |
Vac, Tvs Along With Electrical And Scada Works For 16 Ug Stations In Corridor 3 Of Phase 2 Cmrl Project Including Tunnel And Ramp Sections Between The Stations
|
Description |
Vac, Tvs Along With Electrical And Scada Works For 16 Ug Stations In Corridor 3 Including Tunnel And Ramp Sections Between The Stations
|
Organisation | Chennai Metro Rail Limited - MDB Tenders | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 40000 |
EMD | 7.55 Crore |
Tender Value | |
Place | Chennai |
Link |
AAAAAAAAAA Login to view |
Start Date | May 29, 2025 14:30 |
End Date |
04/06/2025 ( 32 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreArchitectural finishing and phe works for 6 elevated stations of pkg-2 and pkg-3, phase-2b
Architectural finishing and 
 public health engineering works for 6 elevated stations viz, hebbal, kodigehalli, jakkur cross, yelahanka, 
 bagalur cross of package-2 and doddajala of package-3, in phase 2b line of bangalore metro rail project.
Read moreMaintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Read moreAnnual rate contract for the work of construction and commissioning of 150/200 mm. tube wells with providing installation and commissioning of three phase/ single phase power pump set and other related civil and electrical works in sub dn. jaitaran u
Annual rate contract for the work of construction and commissioning of 150/200 mm. tube wells with providing installation and commissioning of three phase/ single phase power pump set and other related civil and electrical works in sub dn. jaitaran u
Read moreConstruction of 3 nos. of 2-seater loo with ramp and planter box in ward no. 16
Construction of 3 nos. of 2-seater loo with ramp and planter box in ward no. 16
Read moreA/r, s/r, anurakshan and other allied works in 24 suits guest house and cpa office building and residential qtrs under pwd capital sub division no.2, bhopal
A/r, s/r, anurakshan and other allied works in 24 suits guest house and cpa office building and residential qtrs under pwd capital sub division no.2, bhopal
Read moreOperation and maintenance of 24 nos. boosting stations at various places of water supply scheme and 24 nos. tubewells in green belt and sector-64 for faridabad with electrical, mechanical and civil work, independent feeder etc. and all other works co
Operation and maintenance of 24 nos. boosting stations at various places of water supply scheme and 24 nos. tubewells in green belt and sector-64 for faridabad with electrical, mechanical and civil work, independent feeder etc. and all other works co
Read moreMaintenance of civil work-addition, alteration modification of various buildings and stations from udyog bhawan to saket metro stations including tunnel section from central secretariat to saket ramp in line-2 (for 3 years).
Maintenance of civil work-addition, alteration modification of various buildings and stations from udyog bhawan to saket metro stations including tunnel section from central secretariat to saket ramp in line-2 (for 3 years).
Read moreof your Industry type