Tender Details

About Tender

🛣️ Invitation For Bids: Gsb Road Infrastructure Project 🛣️ M.P.State Minor Forest Produce Cooperative Federation Limited, A State Government Entity, Is Seeking Bids From Experienced Contractors For The Construction Of Gsb Road, Including The Establishment Of 02 Culverts With Hume Pipe. 🏗️ 📍 Location: Dhapada Main Road To Kusmeri School 📅 Bid Submission Deadline: July 12, 2024, 5:00 Pm 💲 Tender Fee: Inr 5384 💲 Earnest Money Deposit (Emd): Inr 500000 The Project Involves The Construction Of A 1.50 Km Road With A Width Of 4.5 Meters, Including Earthwork To A Depth Of 100 Mm And Sub Base Course (Gsb/Wbm) To A Depth Of 220 Mm. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Project's Specifications And Government Procurement Guidelines. Keywords: Gsb Road Construction, Culverts With Hume Pipe, M.P.State Minor Forest Produce Cooperative Federation Limited, Infrastructure Project, Road Development, Government Tender, Bid Submission, Earnest Money Deposit
Particulars Details
Title
Gsb Road, 02 Culverts With Hume Pipe
Description
Constn. Of Gsb Road, 02 Culverts With Hume Pipe From Dhapada Main Road To Kusmeri School. Length 1.50 Km, Width 4.5 Meter, Thickness Earthwork In 100 Mm And Gsb/Wbm In 220 Mm.
Organisation M.P.State Minor Forest Produce Cooperative Federation Limited | State Govt. and UT
Tender Id 2024_MFPCF_354472_1
Reference
Number
BTNBT_742_28.06.2024
Tender Fee 5384
EMD 5 Lakh
Tender Value
Place Dhapada Main Road to Kusmeri School
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=416690
Start Date July 02, 2024 17:30
End Date

12/07/2024 ( Expired 312 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Supply, installation, testing, commissioning of hospital laundy equipment on turnkey basis with 02 years comprehensive warranty on buy-back basis and operation of laundry services for a period of 10 years at aiims, new delhi

Tender for supply, installation, testing, and&#x0d commissioning of hospital laundry equipment on&#x0d turnkey basis with 02 years comprehensive&#x0d warranty on buy-back basis and operation of&#x0d laundry services for a period of 10 years at aiims.

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise