Tender Details

Particulars Details
Title
Construction From Gurariya To Bharkachh Khurd Road Length 4.50 Km.
Description
Construction From Gurariya To Bharkachh Khurd Road Length 4.50 Km.
Organisation Government of Madhya Pradesh
Tender Id 2023_PWDRB_314636_1
Reference
Number
NIT-20/01/Raisen Dt-03-10-2023
Tender Fee 15000
EMD 4.72 Lakh
Tender Value -
Place CEPWDBHOPAL
Link
View Original Tender Notice

https://mptenders.gov.in

Start Date October 05, 2023 16:00
End Date
Expired 17/10/2023

Expired 1091 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Culvert repair work on bhairuji road in pipalda khurd

Culvert repair work on bhairuji road in pipalda khurd

Read more
Construction of rcc compound wall to nallavagu graveyard of phoolbagh ward 76 in circle - 24, jangammetrajendranagar zone, ghmc(reserved for st individual community) - rs. 4.50 lakhs

Construction of rcc compound wall to nallavagu graveyard of phoolbagh ward 76 in circle - 24, jangammetrajendranagar zone, ghmc(reserved for st individual community) - rs. 4.50 lakhs

Read more
Construction of the new bandha khurd link road, starting from shyam lal house in sonbarsa

Construction of the new bandha khurd link road, starting from shyam lal house in sonbarsa

Read more
Special repair work of muili chandpur link road from chainage 3.145 to 4.997 km (length 1.458 km)

Special repair work of muili chandpur link road from chainage 3.145 to 4.997 km (length 1.458 km)

Read more
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg

Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg

Read more
Supply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana

Supply of electric winch 2mt capacity with wire rope of size 60m*18mm (length*diameter) for movement of manpower in surge chamber at slbhes, srisailam dam west nagarkurnool (dist) - 509326, telangana

Read more
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call

Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call

Read more
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Read more
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.

Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise