Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Abb Power Contactor For 45 Kw Motor,Abb Power Contactor For 30 Kw Motor,Abb Elor 36 To 100 A,Abb Au
|
Description |
|
Organisation | Materials | Ministry of Mines |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 17, 2025 19:51 |
End Date |
08/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreP/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 7.00 to km 40.06 (waste shredded plastic to be used for 3.63 km length) on road mon-lungwa under 100 rcc/15 brtf sector (p) sewak in nagaland state
P/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 7.00 to km 40.06 (waste shredded plastic to be used for 3.63 km length) on road mon-lungwa under 100 rcc/15 brtf sector (p) sewak in nagaland state
Read moreProviding gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Providing gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Read moreRealignment of 100 mm dia/65mm pipe line from ganeshguri flyover to hengrabari housing colony under sopd-g for the year 2024-25
Realignment of 100 mm dia/65mm pipe line from ganeshguri flyover to hengrabari housing colony under sopd-g for the year 2024-25
Read moreAbb power contactor for 45 kw motor,abb power contactor for 30 kw motor,abb elor 36 to 100 a,abb au
Read more
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreof your Industry type