Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Construction Of Head Regulator And Bridges Of Khanpur Distributary
|
| Description |
Estimate For Construction
Of Head Regulator And
Bridges Of Khanpur
Distributary
|
| Organisation | Government of Punjab |
| Tender Id | 2023_WR_112250_1 |
|
Reference Number |
54/22A/2023-24 |
| Tender Fee | 5000 |
| EMD | 3.39 Lakh |
| Tender Value | |
| Place | EXECUTIVE ENGINEER,ROPAR CANAL AND GW,DIVISION WRD |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in |
| Start Date | November 09, 2023 17:30 |
| End Date |
Expired
24/11/2023
Expired 971 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreExpression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Read moreProviding and fitting of wood works, electrical works and other works for operators room at sccr kupwara.
Providing and fitting of wood works, electrical works and other works for operators room at sccr kupwara.
Read moreDesign, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Read moreDetailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreof your Industry type