Tender Details

Particulars Details
Title
Sitc Of New Oil Coolers For 15 Mva Power Transformers Of 105 Mw (3x35) Ushp Ii, Kangan Hep
Description
Sitc Of New Oil Coolers For 15 Mva Power Transformers Of 105 Mw (3x35) Ushp Ii, Kangan Hep
Organisation JKSPDC | State Govt. and UT
Tender Id 2024_SPDC_262221_1
Reference
Number
USHP-II/GD/21 of 2024-25
Tender Fee 500
EMD 16000
Tender Value
Place Kangan, Ganderbal
Link https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=815927
Start Date November 29, 2024 15:30
End Date

07/12/2024 ( Expired 135 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sitc of data networking and epabx system work for new cardiology block at kgmu u.p., lucknow

Sitc of data networking and epabx system work for new cardiology block

Read more
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Read more
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km

Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km

Read more
Rate contract for procurement of 33/11 kv 5 mva low loss (4/23 kw) and 10 mva low loss (8/50kw) power transformers for a period of one year

Rate contract for procurement of 33/11 kv 5 mva low loss (4/23 kw) and 10 mva low loss (8/50kw) power transformers for a period of one year

Read more
Procurement of 4500 lph high vacuum transformer oil filteration machine for 3x20 mw, bs iii, mppgcl, deolond

Procurement of 4500 lph high vacuum transformer oil filteration machine for 3x20 mw, bs iii, mppgcl, deolond

Read more
Construction of power evacuation system for development of 2450 mw solar park at pugal, bikaner

Construction of power evacuation system for development of 2450 mw solar park at pugal, bikaner under lot-1, lot-2 and lot-3 including survey, design, engineering, supply of all equipments /materials, etc along with associated civil works on turnk

Read more
Supply of 2 wire signal transmitter and power electronic module ke-3 for tclc system of 2x500 mw, btps, anpara

Supply of 2 wire signal transmitter and power electronic module ke-3 for tclc system of 2x500 mw, btps, anpara

Read more
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur

Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur

Read more
Srcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority

Srcc/bnr/pt/010/tnso/2025-26 construction of new fire pump house including pile foundations (offshore) and allied works for re-vamping of fire fighting facilities for oil docks bharati dock-i and bharati dock-iii inside chennai port authority

Read more
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period

Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise