Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Pontoon Rectification Project 🛠️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Rectification Of 15 Old Pontoons At The Gevra Project Site. The Project Involves Assembling 121 Empty Drums On Each Pontoon To Enhance Their Structural Integrity And Performance. 📅 Bid Submission Deadline: May 07, 2024, 5:00 Pm A Tender Fee Of Inr 16,600 Has Been Set, With The Earnest Money Deposit (Emd) Being The Same Amount. Interested Bidders Should Submit Detailed Proposals, Including Methodology, Timelines, And Cost Estimates, Adhering To The Project Specifications. Keywords: Pontoon Rectification, Coalfields, South Eastern Coalfields Limited, Secl, Public Sector Undertaking, Construction, Bid, Tender, Gevra Project| Particulars | Details |
|---|---|
| Title |
Work Of Rectification Of 15 Nos. Old Pontoon 6.6 M X 6.6 M X 0.90 M By Assembling 121 Nos. Empty Drums On Each Pontoon At Quarry Of Gevra Project.
|
| Description |
Work Of Rectification Of 15 Nos. Old Pontoon 6.6 M X 6.6 M X 0.90 M By Assembling 121 Nos. Empty Drums On Each Pontoon At Quarry Of Gevra Project.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_307041_1 |
|
Reference Number |
SECL/GA/SO ENM/24-25/E-TENDER/15 dt.24/04/2024 |
| Tender Fee | 0 |
| EMD | 16600 |
| Tender Value | - |
| Place | Gevra Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318170 |
| Start Date | April 27, 2024 15:30 |
| End Date |
Expired
07/05/2024
Expired 887 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of making of 10 nos. pontoon 6.6 m x 6.6 m x 0.90 m by assembling 121 nos. empty drums on each pontoon at quarry of gevra project.
Work of making of 10 nos. pontoon 6.6 m x 6.6 m x 0.90 m by assembling 121 nos. empty drums on each pontoon at quarry of gevra project.
Read moreWork of making of 02 nos. pontoon 6.6 m x 6.6 m x 0.90 m by assembling 121 nos. empty drums on each pontoon at quarry of gevra project.
Work of making of 02 nos. pontoon 6.6 m x 6.6 m x 0.90 m by assembling 121 nos. empty drums on each pontoon at quarry of gevra project.
Read moreWork of rectification of 10 nos. old pontoon 6.6m x 6.6m x 0.9m by assembling 121 nos. empty drum on each pontoon at quarry of gevra project.
Work of rectification of 10 nos. old pontoon 6.6m x 6.6m x 0.9m by assembling 121 nos. empty drum on each pontoon at quarry of gevra project.
Read moreWelding work of 05 of new pontoon for installation of pumps during monsoon at quarry, gevra project.
Welding work of 05 of new pontoon for installation of pumps during monsoon at quarry, gevra project.
Read moreWork of rectification of overhead line and minor maintenance of 6.6 kv / 3.3 kv / lighting line in case of a breakdown in all three shifts at the quarry of the gevra project for 365 days.
Work of rectification of overhead line and minor maintenance of 6.6 kv / 3.3 kv / lighting line in case of a breakdown in all three shifts at the quarry of the gevra project for 365 days.
Read moreProposal for repairing/ fabrication of 90nos plastic drums damaged pontoon for installation of pump and motor at borira quarry for dewatering of mines water at docp.
Proposal for repairing/ fabrication of 90nos plastic drums damaged pontoon for installation of pump and motor at borira quarry for dewatering of mines water at docp.
Read moreDi/extension and dismantling of 6.6 kv power line of western part on as and when required basis of quarry section of gevra project for a period of 365 days
Di/extension and dismantling of 6.6 kv power line of western part on as and when required basis of quarry section of gevra project for a period of 365 days
Read moreDi/extension and dismantling of 6.6 kv power line of eastern part on as and when required basis of quarry section of gevra project for a period of 365 days.
Di/extension and dismantling of 6.6 kv power line of eastern part on as and when required basis of quarry section of gevra project for a period of 365 days.
Read moreDi /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Read moreDi/extension and dismantling of 6.6 kv power line of l/k (lower kusmunda region) on as and when required basis of quarry section of gevra project for a period of 365 days.
Di/extension and dismantling of 6.6 kv power line of l/k (lower kusmunda region) on as and when required basis of quarry section of gevra project for a period of 365 days.
Read moreof your Industry type