Tender Details

Particulars Details
Title
Balance Work Of 6 Lane Flyover At Km 5 680 Naharkanta Flyover On Chandikhole Jagatpur Bhubaneswar Section Of Nh 5 From Km 414 000 To Km 419 000 And Km 0 000 To Km 62000 In The State Of Odisha On Item Rate Basis 2nd Call.
Description
Balance Work Of 6 Lane Flyover At Km 5 680 Naharkanta Flyover On Chandikhole Jagatpur Bhubaneswar Section Of Nh 5 From Km 414 000 To Km 419 000 And Km 0 000 To Km 62000 In The State Of Odisha On Item Rate Basis 2nd Call.
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_226987_1
Reference
Number
NHAI/Naharkanta/2025/PIU/BBSR/
Tender Fee 25000
EMD 4.02 Lakh
Tender Value
Place Naharkanta flyover (Hanspal)
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=258570
Start Date March 12, 2025 18:45
End Date

01/04/2025 ( Expired 21 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire

Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage

Read more
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis

Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis

Read more
Rehabilitation and up-gradation of two lane with paved shoulder on balance section of 4.53 km long katol-warud section of nh 353-j (km 67/100 to km 67/885 km 76/100 to km 77/060 km 80/450 to km 81/520 km 82/000 to km 82/230 km 82/400 to 82/610

Rehabilitation and up-gradation of two lane with paved shoulder on balance section of 4.53 km long katol-warud section of nh 353-j (km 67/100 to km 67/885 km 76/100 to km 77/060 km 80/450 to km 81/520 km 82/000 to km 82/230 km 82/400 to 82/610

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Independent engineer services for operation and maintenance of four laning of sinnar-shirdi section of nh 160 from km 0 000 to km 50 943 in the state of maharashtra 2nd call

Independent engineer services for operation and maintenance of four laning of sinnar-shirdi section of nh 160 from km 0 000 to km 50 943 in the state of maharashtra 2nd call

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise