Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pipe Railing Removal And Refixing Of Existing Work Submersible Bridges, Under Bridge Construction Sub Division 1 Bhopal
|
| Description |
Pipe Railing Removal And Refixing Of Existing Work Submersible Bridges, Under Bridge Construction Sub Division 1 Bhopal
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_283919_1 |
|
Reference Number |
03/Setu/2023 |
| Tender Fee | 2000 |
| EMD | 20560 |
| Tender Value | - |
| Place | Executive Engineer PWD Bridge Division Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 15, 2023 16:00 |
| End Date |
Expired
04/07/2023
Expired 1195 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Construction of hl rcc bridge (9x29.85m) in place of existing old damaged bridge over suknar river at 80th km of nh 333a khaira-sono road, mangobandar bridge, in the district of jamui.
Read moreRemoval of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Removal of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreRemoval and refixing of pipe railing of submersible bridge under bridge - sub division no 01 - narmadapuram
Removal and refixing of pipe railing of submersible bridge under bridge - sub division no 01 - narmadapuram
Read morePipe railing removal and refixing of existing work of submersible bridge under bridge construction - sub division vidisha
Pipe railing removal and refixing of existing work of submersible bridge under bridge construction - sub division vidisha
Read moreRemoval and refixing of pipe railing of submersible bridge under bridge - sub division betul
Removal and refixing of pipe railing of submersible bridge under bridge - sub division betul
Read moreRemoval and refixing of pipe railing of submersible bridge under bridge - sub division raisen
Removal and refixing of pipe railing of submersible bridge under bridge - sub division raisen
Read moreRemoving and refixing of ornamental railing pipe railing before and after rains includingtransportation from bridge to store and security in rainy season and repairing and maintance of submersible bridge railing etc of pwd setu sub division ujjain
Removing and refixing of ornamental railing pipe railing before and after rains includingtransportation from bridge to store and security in rainy season and repairing and maintance of submersible bridge railing etc of pwd setu sub division ujjain
Read moreRepair of wearing coat of submersible bridge across kolar river on chhidgaon kachhi or narsullaganj road work under bridge sub division no-02 bhopal distt sehore
Repair of wearing coat of submersible bridge across kolar river on chhidgaon kachhi or narsullaganj road work under bridge sub division no-02 bhopal distt sehore
Read moreof your Industry type