Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of 3000 Gpm Pump Motor Of Jarlahi Coal Sump From Damaged Pontoon And Installation On Ground Level And Maintenance Of Pump And Reorganise Its Pipeline And Transporting Of Damage Pontoon To The F/B For Repairing At Phularitand,Ampc.
|
Description |
Shifting Of 3000 Gpm Pump Motor Of Jarlahi Coal 
Sump From Damaged Pontoon And Installation On 
Ground Level And Maintenance Of Pump And Reorganise Its Pipeline And Transporting Of Damage Pontoon To The F/B For Repairing At Phularitand,Ampc.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_330165_1 |
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/513 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | AMP COLLIERY, BARORA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342244 |
Start Date | February 26, 2025 00:00 |
End Date |
08/03/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(a)annual maintenance contract, shifting and installation of (04 nos.) r.o water purifier, capacity- 80 ltrs. for providing of pure drinking water at different locations under kathara colliery for the period of two (2) years. (b) electrical repairing
(a)annual maintenance contract, shifting and installation of (04 nos.) r.o water purifier, capacity- 80 ltrs. for providing of pure drinking water at different locations under kathara colliery for the period of two (2) years. (b) electrical repairing
Read moreInstallation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 60 days at bazari more under s.b. project.
Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 60 days at bazari more under s.b. project.
Read more(a) 3600 gpm pump motor installation along with extension of 10in dia m.s.pipe delivery range at deco face. (b) collection of 10in and 8in dia m.s pipe different areas. (c) shifting of 4000 gpm 10uph8 pump and 2000 gpm 9pm pump along with delive
(a) 3600 gpm pump motor installation along with extension of 10in dia m.s.pipe delivery range at deco face. (b) collection of 10in and 8in dia m.s pipe different areas. (c) shifting of 4000 gpm 10uph8 pump and 2000 gpm 9pm pump along with delive
Read moreDay-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.
Read more(a) hoisting of burnt and lowering of repaired 6stage submersible pump motor with cable at budora office borehole for domestic water supply to workers colony (b) recovery and repairing of 10dinch pipes at mines of phularitand, ampc.
(a) hoisting of burnt and lowering of repaired 6stage 
 submersible pump motor with cable at budora office 
 borehole for domestic water supply to workers colony 
 (b) recovery and repairing of 10dinch pipes at mines of 
 phularitand, ampc.
Read moreDrinking water supply arrangement and running maintenance of different arws rws nrdwp ridf jjm retrofitting schemes under mohanpur municipal council sh repairing maintenance and complete rewinding of damaged pump and burnt submersible motor (dtw
Drinking water supply arrangement and running maintenance of different arws rws nrdwp ridf jjm retrofitting schemes under mohanpur municipal council sh repairing maintenance and complete rewinding of damaged pump and burnt submersible motor (dtw
Read more(a) repairing and maintenance of 3.3kv o/h line to feeding power of chitahi basti (b) di of 6.6kv o/h line due to widening of transporting haul road and ob dump and dismantling of idle 6.6kv o/h line from socp old coal face of amp colliery.
(a) repairing and maintenance of 3.3kv o/h line to feeding power of chitahi basti (b) di of 6.6kv o/h line due to widening of transporting haul road and ob dump and dismantling of idle 6.6kv o/h line from socp old coal face of amp colliery.
Read moreA)repairing / modification of damaged bed plate with installation of 2000 gpm pump and 335 kw ht motor set(b)repairing / modification of damaged bed plate with installation of 2000 gpm pump3 and 335 kw ht motor set(c)rep / modi. of damag bed plate
A)repairing / modification of damaged bed plate with installation of 2000 gpm pump and 335 kw ht motor set(b)repairing / modification of damaged bed plate with installation of 2000 gpm pump3 and 335 kw ht motor set(c)rep / modi. of damag bed plate
Read moreA)repairing and modification of bed plate with installation of pump motor set at khudia river and 6 incdia m.s pipe line installed for water supply of kumbhakar village and dahibari mahato (b) mechanical repairing and modification of damaged bed plat
A)repairing and modification of bed plate with installation of pump motor set at khudia river and 6 incdia m.s pipe line installed for water supply of kumbhakar village and dahibari mahato (b) mechanical repairing and modification of damaged bed plat
Read moreShifting of 1000gpm domestic water supply pump motor in upper side of the sump and other miscellaneous pumping and pipeline works of albion ocp at damoda colliery.
Shifting of 1000gpm domestic water supply pump 
 motor in upper side of the sump and other 
 miscellaneous pumping and pipeline works of albion 
 ocp at damoda colliery.
Read moreof your Industry type