Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Con Of Old Marketing Section To New Csc In Vannarpettai, Tirunelveli
|
| Description |
Con Of Old Marketing Section To New Csc In Vannarpettai, Tirunelveli 
(Second Call).
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2024_BSNL_188154_1 |
|
Reference Number |
NIT.54(1)/BSNL/CD/MDU/2023-24 |
| Tender Fee | 590 |
| EMD | 4855 |
| Tender Value | |
| Place | Tirunelveli |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=205870 |
| Start Date | February 25, 2024 23:30 |
| End Date |
Expired
02/03/2024
Expired 863 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based
 maintenance contract in the state of uttar pradesh.
Read moreReplacement of old 11kv panels of (2x10) mva receiving station brein by way of supply, installation, testing and commissioning of new 11kv (2plus4) panel set.
Replacement of old 11kv panels of (2x10) mva receiving station brein by way of supply, installation, testing and commissioning of new 11kv (2plus4) panel set.
Read moreIe services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreProviding essential service for the period from 16.07.2026 to 31.03.2027 for the annual maintenance of old tnhb head office building nandanam chennai
Providing essential service for the period from 16.07.2026 to 31.03.2027 for the annual maintenance of old tnhb head office building nandanam chennai
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreof your Industry type