Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mundolil Devaswom In Haripad Group New Wiring To The Auditorium And Rewiring To The Anakkottill Repairs And Replacement Of Existing Old And Damaged Electrical Installation To The Various Places Of Temple
|
Description |
Mundolil Devaswom In Haripad Group New Wiring To The Auditorium And Rewiring To The Anakkottill Repairs And Replacement Of Existing Old And Damaged Electrical Installation To The Various Places Of Temple
|
Organisation | Travancore Devaswom Board | State Govt. and UT |
Tender Id | 2024_TDB_716846_1 |
Reference Number |
TDB/EEE/ET-198/2024-25 |
Tender Fee | 960 |
EMD | 10140 |
Tender Value | |
Place | mundolil |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1149327 |
Start Date | January 08, 2025 23:30 |
End Date |
11/01/2025 ( Expired 169 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreAsphlting of road from putlighar chauraha to masjid fakhruddin and various places in ward no.09, zone no.05
Asphlting of road from putlighar chauraha to masjid fakhruddin and various places in ward no.09, zone no.05
Read moreProviding and installation of single phase 2 hp submersible motor pump and pipe line at various places in ward no. 21
Providing and installation of single phase 2 hp submersible motor pump and pipe line at various places in ward no. 21
Read moreRepair/maint including replacement of damaged roof sheets and allied works, repair/maint including replacement of damaged/ unserviceable internal wiring with copper wiring connected works and allied works, welcome maint of various buildings and allie
Repair/maint including replacement of damaged roof sheets and allied works, repair/maint including replacement of damaged/ unserviceable internal wiring with copper wiring connected works and allied works, welcome maint of various buildings and allie
Read moreInstallation of new paver blocks and refixing old paver blocks in zone 19 ward 50 hawkers zone.
Installation of new paver blocks and refixing old paver blocks in zone 19 ward 50 hawkers zone.
Read morePeriodical services to boundary walls in arjan, omq area and repair/maint including replacement of damaged/ unserviceable internal wiring with copper wiring, connected works and allied works at kv area/10 afh/arjan area at afs hasimara
Periodical services to boundary walls in arjan, omq area and repair/maint including replacement of damaged/ unserviceable internal wiring with copper wiring, connected works and allied works at kv area/10 afh/arjan area at afs hasimara
Read moreRepair/maint of boundary walls including replacement of concertina coil and fencing repairs at 10afh area, repair/maint including ccd painting of various surfaces and other buildings and repair/maint including replacement of damaged/ unserviceable
Repair/maint of boundary walls including replacement of concertina coil and fencing repairs at 10afh area, repair/maint including ccd painting of various surfaces and other buildings and repair/maint including replacement of damaged/ unserviceable
Read moreEngineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreReplacement of pipes of drainage lines of damaged drains in back lines from lane no. 1,2,3,4,5 behind prem chaudhary in raj nagar sector a under zone no. 20 ward no. 05 to pipaleshwar mahadev temple.
Replacement of pipes of drainage lines of damaged drains in back lines from lane no. 1,2,3,4,5 behind prem chaudhary in raj nagar sector a under zone no. 20 ward no. 05 to pipaleshwar mahadev temple.
Read moreof your Industry type