Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling, Shifting, Fabrication And Erection Of Worn Out Ms Pipe, Support Guard, Cyclone Base And Support Guard Flange For Ms Pipe Side Clamp And Dismantling Shifting Installation, Erection Of Gear Box And Motor, Screen Block Pannel Of Screen Unit
|
Description |
Dismantling, Shifting, Fabrication And Erection Of Worn Out Ms Pipe, Support Guard, Cyclone Base And Support Guard Flange For Ms Pipe Side Clamp And Dismantling Shifting Installation, Erection Of Gear Box And Motor, Screen Block Pannel Of Screen Unit
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_BCCL_296859_1 |
Reference Number |
BCCL/PO/MCW/E-TENDER/ 2023-24/106 |
Tender Fee | |
EMD | 2813 |
Tender Value | |
Place | MADHUBAN COAL WASHERY |
Link | https://coalindiatenders.nic.in |
Start Date | December 25, 2023 14:30 |
End Date |
02/01/2024 ( Expired 552 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in 4a to 4f
Mtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in 4a to 4f
Read moreDismantling and removing the existing worn-out /damaged weigh bridge and design supply installation testing and commissioning of pitless type weighbridge in vellakkal solid waste management center entry side weigh bridge ward92,zone 5
Dismantling and removing the existing worn-out /damaged weigh bridge and design supply installation testing and commissioning of pitless type weighbridge in vellakkal solid waste management center entry side weigh bridge ward92,zone 5
Read moreDismantling and removing the existing worn-out damaged weigh bridge and design supply installation testing and commissioning of pitless type weighbridge in vellakkal solid waste management center exit side weigh bridge ward 92 zone5
Dismantling and removing the existing worn-out damaged weigh bridge and design supply installation testing and commissioning of pitless type weighbridge in vellakkal solid waste management center exit side weigh bridge ward 92 zone5
Read moreDismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery
Dismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery
Read moreDismantling, repair, fabrication and erection of 8 inch dia m.s pipe line and dismantling and fitting of flange 8 inch and valve 8 inch at coal stock heap no. 12 with extension of g.i pipe line 6 inch dia with fitting of 6 inch sluice valve and conne
Dismantling, repair, fabrication and erection of 8 inch dia m.s pipe line and dismantling and fitting of flange 8 inch and valve 8 inch at coal stock heap no. 12 with extension of g.i pipe line 6 inch dia with fitting of 6 inch sluice valve and conne
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1f
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1f
Read moreDismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Read moreRepair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery
Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreRepairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Repairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Read moreof your Industry type